May 10, 2011 - City Council Memorandum — <br />Solander Center Exterior Building Improvements Bid No. 6935, Contract Award <br />improvements to the WIC Offices include new flooring, carpet and vinyl tile, removing a non - bearing <br />wall, and adding an exterior door. These improvements have already been accomplished under <br />separate bid. <br />The exterior work includes improving the facade of the building to more closely match the existing <br />structures within the park. This work includes installing cement board and resurfacing it with a <br />textured coating that not only resembles stucco but is also a recognized "cool wall' coating. The <br />existing windows will be replaced with new low "E" glazing. Safety rails will be installed around the <br />existing HVAC units to protect public access and a new staircase will be cut -into the center section <br />of the existing elevated walkway to better define the main entrance to the facility. Although our <br />roofing consultant determined that a full roof replacement was not necessary at this time we will be <br />performing selective preventive maintenance work on the roof in several areas. <br />Nine (9) contractors submitted proposals when bids closed on March 24, 2011. New Millennium <br />Construction of Chino Hills was determined the lowest responsible bidder at a cost of $55,999. <br />FISCAL IMPACT: <br />The $55,999 cost of this project is funded by a federal grant and funds are available in account <br />number 9227651- 440120. <br />Prepared by: Kris Martinez, General Services Director <br />Approved by: Belinda J. Graham, Assistant City Manager <br />for Bradley J. Hudson, City Manager <br />Certified as to the availability <br />of funds: Paul Sundeen, Assistant City Manager /CFO /Treasurer <br />Approved as to form: Gregory P. Priamos <br />23 -2 <br />