Home
Clerk
>
City Council/Agency Reports
>
2010s
>
2011
>
December
>
12-13-2011
>
12-13-2011 CC RPT 52
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2012 12:00:26 PM
Creation date
12/8/2011 5:29:32 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
City Council Reports
Document Relationships
12-13-2011 CC RA HA AGENDA
(Superseded by)
Path:
\City Council Agendas\2010-2019\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
n <br />CITY OF <br />R-1V R,S1D <br />City Council Memorandum <br />City s Arts &Innovation <br />TO: HONORABLE MAYOR AND CITY COUNCIL DATE: December 13, 2011 <br />FROM: PUBLIC WORKS DEPARTMENT ITEM NO: 52 <br />Ui%1 N IM] <br />SUBJECT: RIVERSIDE RENAISSANCE —BID NO. 6782—MAGNOLIA AVENUE UNDERPASS <br />AT UNION PACIFIC RAILROAD — INCREASE IN CHANGE ORDER AUTHORITY <br />ISSUE <br />The issue for City Council consideration is approval of an increase in change order authority for the <br />Magnolia Avenue Grade Separation Project (Project). <br />RECOMMENDATION <br />That the City Council authorize an increase of $1,680,051.75 to the cumulative change order <br />authority for Bid No. 6782 — Magnolia Avenue Underpass at the Union Pacific Railroad. <br />BACKGROUND <br />On December 1, 2009, the City Council awarded an $11,637,802.50 contract to Riverside <br />Construction Company Inc., for the Project. The low bid was 40.31% under the Engineer's <br />estimate. The Project included: <br />• Demolition and removal of six (6) buildings; <br />• Construction of a temporary single railroad shoofly track; <br />• Relocation and reconstruction or undergrounding of existing overhead utilities, reconstruction <br />of existing water, storm drain facilities; <br />• Construction of a double track steel bridge structure; <br />• Excavation and construction of Magnolia Avenue for approximately 1,500 feet, from <br />approximately 750 feet south of the Union Pacific (UP) Railroad crossing to approximately <br />750 feet north of the UP Railroad crossing, including landscaping and irrigation <br />improvements; <br />• Construction of approximately 1,600 feet of roadway modifications and widening on Beatty <br />Drive, Merrill Avenue, and Nogales Street; and <br />• Construction of new storm water pumping station. <br />52 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.