Laserfiche WebLink
W A f I M 4 N t w f ■ I I I I <br /> RIVERSIDE PUBLIC UTILITIES <br /> k& Board Memorandum <br /> PUHi ' t UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: November 19, 2010 <br /> ITEM NO: 20 <br /> SUBJECT: WATER HIGHLIGHTS—October 2010 <br /> Domestic water production for the month of October 2010,totaled 5,403 acre feet(1,761 million gallons),with <br /> the following resource mix: <br /> • Bunker Hill Basin: 81% <br /> • Riverside Basin: 19% <br /> • Purchased Water- 0% <br /> Peak water usage for the month of October 2010, was 72.2 million gallons per day(mgd) and occurred on <br /> October 11 th. <br /> Under the Cooperative Agreement for Water Production and Conveyance with Western Municipal Water <br /> District, 501.8 of potable water and 100.1 AF of irrigation water were delivered to WMWD, 29.7 AF were <br /> sold to the Home Gardens Community Services District. <br /> There was one significant event for the water system in October 2010. From October 19tn through October <br /> 21 sc was the shut down of the Gage Transmission Line to replace the Lem ona Power Generator Turbine. <br /> Current Period Last Month October 2009 <br /> Peak Consumption: 72.2 mgd 87.9 mgd 80.6 mgd <br /> Average Consumption: 54.7 mgd 76.4 mgd 67.4 mgd <br /> Minimum Consumption: 38.7 mgd 66.1 mgd 51.7 mgd <br /> Total Consumption: 5,403 AF 7,149 AF 6,471 AF <br /> Peak Temperature. 102 113 100 <br /> Average Temperature: 78 93 80 <br /> Minimum Temperature: 64 72 63 <br />