Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2012 BPU
>
08-17-12
>
08-17-12 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2015 12:58:21 PM
Creation date
9/29/2015 12:53:02 PM
Metadata
Fields
Template:
General
Department
Public Utilities
General - Type
Misc
Document Relationships
08-17-2012 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2012 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R 8 N E R G Y L I F E <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> PUBLIC UTILITIES <br /> BOARD OF PUBLIC UTILITIES DATE: August 17, 2012 <br /> ITEM NO: 5 <br /> SUBJECT: CONSTRUCTION OF THE GOODMAN/ROYCE DISTRIBUTION MAIN <br /> REPLACEMENT PROJECT—WORK ORDER NO. 1214257 <br /> ISSUE: <br /> That the Board of Public Utilities consider approval of the capital expenditure in the amount of <br /> $1,645,044 to construct the Goodman/Royce Distribution Main Replacement Project. <br /> RECOMMENDATION: <br /> That the Board of Public Utilities approve the capital expenditure of $1,645,444 for Work Order No. <br /> 1214257 which includes all design, construction, paving, contract administration and construction <br /> contingency costs for the Goodman/Royce Distribution Main Replacement Project. <br /> BACKGROUND: <br /> The construction of the Goodman/Royce Distribution Main Replacement Project is part of the on-going <br /> water main replacement program to replace old and high priority leaky mains. The project area consists <br /> of existing 4-inch and 6-inch cast iron water mains that were installed in the 1950's and 1960's and have <br /> experienced several leaks. The work will entail the construction of approximately 6,000 linear feet of <br /> eight-inch ductile iron pipe, 14 fire hydrants, 136 service tie-overs, and nine system connections. The <br /> work identified will be constructed by the Water Division's field forces. <br /> Once the new water pipelines are installed, Riverside Public Utilities (RPU) will be responsible for <br /> standard trench repaving per the Public Works standard. Near the end of pipeline construction, staff will <br /> solicit paving bids for paving the trench area through the Public Utilities Paving Contractor Panel. A <br /> budgetary estimate for the paving work has been included in this authorization. <br /> FISCAL IMPACT: <br /> The total capital expenditure for Work Order No. 1214257 is estimated to be $1,645,004 which includes <br /> all design, construction, paving, contract administration and inspection costs necessary to perform the <br /> work, as summarized in the following table: <br /> Description Cost Percent of Total <br /> Design $70,400 4.2% <br /> Construction (City Forces) $1,085,440 66.0% <br /> Paving Budget (Contractor Panel) $450,000 27.4% <br /> Construction Survey/Testing $10,004 0.6% <br /> Contract Managementllnspection (Paving) $30,000 1.8% <br /> Work Order Total $1,645,000 10010 <br /> Sufficient funds are available in the Public Utilities' Water Main Replacement Account No. 6230000- <br /> 474707. <br />
The URL can be used to link to this page
Your browser does not support the video tag.