Laserfiche WebLink
11/03/2021 <br />Riverside -Downtown <br />STATION IMPROVEMENTS Illustrative New Track, Platform, Parking <br />1 <br />TO LOS ANGELES <br />Existing Main Parking Lot <br />Platform 1 <br />DIAGRAM11 <br />NOT TO SCALE <br />Proposed Parking Lot <br />0) <br />W <br />LU <br />w <br />J <br />Existing <br />Overflow <br />Parking Lot <br />Station Track No. <br />® BNSF Mainline <br />Ensting Pedestrian Overpass <br />Pedestrian Overpass Extension <br />En Existing FMC Buildings <br />- Existing Track <br />- Reconstruct Existing Track <br />Proposed Track & Platlarm <br />Existing Track Ta Be Removed <br />▪ Proposed ADA Parking <br />▪ Proposed Kiss -n -Ride <br />3 <br />3 <br />Riverside -Downtown <br />STATION IMPROVEMENTS <br />Proposed Project <br />h <br />11 '1 Ali I <br />LiDRAFT FOR INFORMATION ONLY <br />RIVERSIDE DOWNTOWN SSTA ZION EXPANSION <br />* 11 <br />4 <br />4 <br />2 <br />