Home
Clerk
>
City Council/Agency Reports
>
1990s
>
1998
>
December
>
12-01-1998
>
12-01-1998 CC RPT 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2009 10:28:08 AM
Creation date
12/10/1998 6:24:45 PM
Metadata
Fields
Template:
General
General - Type
City Council Reports
General 2 - Date
12/1/1998
Number
19
Document Relationships
12-01-1998 CC AGENDA
(Agenda)
Path:
\City Council Agendas\1997-1999\1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
People Serving <br />PeoFle <br /> <br />CITY OF RIVERSIDE <br /> <br />CITY COUNCIL MEMORANDUM <br /> <br />Riverside <br /> <br />HONORABLE MAYOR AND CITY COUNCIL <br /> <br />DATE: December 1, 1998 <br /> <br />ITEM NO: 19 <br /> <br />SUBJECT: SELECTION OF ENGINEERING CONSULTANT - WATER SUPERVISORY CONTROL <br /> AND DATA ACQUISITION (SCADA) SYSTEM UPGRADE <br /> <br />BACKGROUND: <br /> <br />Authorization is requested to award a contract to Montgomery Watson Americas, Inc., for consulting <br />engineering services to upgrade the City's aging Water Supervisory Control and Data Acquisition <br />(SCADA) system. The existing system, installed in 1970, is outdated and the manufacturer has stopped <br />any repair support. The services of an engineering consultant are needed because of the specialized <br />nature of the work. <br /> <br />The Screening and Selection Committee interviewed the following consulting firms: <br /> <br />1. Montgomery Watson Americas, Inc. <br />2. CyberNet/Timberline Engineering <br />3. Westin Engineering, Inc. <br /> <br />The Committee has selected Montgomery Watson Americas, Inc. of Pasadena, California, to perform <br />the work. A contract has been negotiated to include design, specifications and services during <br />construction at an estimated cost not to exceed $259,700. <br /> <br />The Board of Public Utilities approved and recommended City Council approval of this item at its meeting <br />of September 4, 1998. <br /> <br />FISCAL IMPACT: <br /> <br />Funds are budgeted and available for design services in the Water Capital Improvement account of the <br />Public Utilities Department (Account No. 520-769200-470771 - Water System SCADA). <br /> <br />The total project cost, including construction, is estimated at $1,100,000. Additional funds will be <br />budgeted for Fiscal Year 1999/00 to supplement the construction costs. <br /> <br />19-1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.