Laserfiche WebLink
People Serving <br />People <br /> <br /> CITY OF RIVERSIDE <br />AGENCY MEMORANDUM <br /> <br />Riverside <br /> <br />ill,America Clt~ <br /> <br />1998 <br /> <br />HONORABLE MAYOR AND AGENCY MEMBERS DATE: July 13, 2004 <br /> <br /> ITEM NO: <br /> <br />SUBJECT: MARKET STREET IMPROVEMENTS PROJECT PHASE I - SUPPLEMENTAL <br /> <br />APPROPRIATION <br /> <br />BACKGROUND: <br /> <br />On June 20, 2003, the City awarded a $2,458,606 contract to H & H General Contractors Inc. ("Contractor") <br />for the construction of the Market Street Phase I Improvement Project between SR 60 and Fairmount. The <br />project was funded by a combination of Economic Development Grant and City Redevelopment Funds. In <br />addition, the Riverside County Flood Control District contributed $160,000 towards construction of the box <br />culvert. Construction of this project began on July 21, 2003, and was completed on May 20, 2004. <br /> <br />CURRENT ISSUE: <br /> <br />At this time, all of the contract contingency funds have been exhausted. Appropriation of additional funds is <br />necessary to pay the contractor for additional work required to complete the project, settle a claim for delay, <br />and for the cost of additional fill material. <br /> <br />The additional work included expanding the landscaping to eliminate barren areas, additional storm drain <br />work as a result of changed site conditions and the addition of five Raincross-style street lights in the median. <br />The delay claim is a result of encountering three previously unknown underground telephone cables, which <br />resulted in the relocation of these cables. In addition, the contract documents understated the quantity of fill <br />necessary to construct this project. <br /> <br />The cumulative total of these changes brings the final contract cost to $2,760,423.28 resulting in a net <br />increase of $301,817.28 or 12.3% over the original contract amount. The authorized change order authority <br />on this project is 25%. This brings the total cost of the project to $3,195,145.57 including included design, <br />construction and contract administration. This exceeds the $3,069,331.06 originally appropriated for this <br />project by $125,814.51. Staff is requesting an additional appropriation of $180,000 to cover the funding <br />shortfall and for the final paving of the roadway that will occur after construction of the proposed office <br />building on the northside of the street. <br /> <br />FISCAL IMPACT: <br /> <br />Sufficient funds are available in the Downtown/Airport Fund Balance Account Number 0000478-298000 to <br />appropriate $180,000 to the Market Street Improvements Account Number 9772600-440446. <br /> <br />ALTERNATIVES: <br /> <br />The Redevelopment Agency Board may elect to not authorize the additional fund appropriation. However, <br />this alternative could result in the Agency and/or City incurring additional costs, including legal fees, should <br />the contractor file a lawsuit to recover its costs. <br /> <br />19-1 <br /> <br /> <br />