Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2023 BPU
>
11-13-2023 BPU
>
11-13-2023 RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 5:04:44 PM
Creation date
10/31/2023 5:04:26 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
11-13-2023 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2023 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WATER 1 ENERGY I LIFE <br />PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: NOVEMBER 13, 2023 <br />SUBJECT: FIND G. HURTADO CONSTRUCTION, INC. IN DEFAULT OF THE CONTRACT <br />FOR THE CONSTRUCTION OF THE BROCKTON AVENUE WATER MAIN <br />REPLACEMENT PROJECT — BID NO. RPU -7816 <br />ISSUE: <br />Consider finding G. Hurtado Construction, Inc. in default of the Contract for the Construction of <br />the Brockton Avenue Water Main Replacement Project — Bid No. RPU -7816 <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Find G. Hurtado Construction, Inc. in default of the Contract for the Construction of the <br />Brockton Avenue Water Main Replacement Project — Bid No. RPU -7816, as required by <br />the Contract documents; <br />2. Authorize the City Manager, or designee, to terminate G. Hurtado Construction, Inc's. right <br />to perform under the Contract by issuing a written notice of termination for default to the <br />Contractor and its Surety, United States Fire Insurance Company; and <br />3. Authorize City Manager, or designee, to execute any agreements or documents necessary <br />to carry out the contract termination and effectuate the completion of the project, including <br />documents and agreements needed to carry out the Surety's obligations under the contract <br />and performance bond. <br />BACKGROUND: <br />On August 23, 2021, the Riverside Board of Public Utilities (Board) awarded a construction <br />contract (Contract) to G. Hurtado Construction, Inc. (Hurtado) in the amount of $1,723,260 for the <br />construction of the Brockton Avenue Water Main Replacement Project. This project is part of <br />Riverside Public Utilities' (RPU) ongoing water main replacement and water loss program to <br />replace high priority waterlines and involves the construction of approximately 3,300 linear feet of <br />12 -inch ductile iron pipe, 600 linear feet of 8 -inch ductile iron pipe, 48 water services, and 3 fire <br />hydrants, along with all necessary fittings, appurtenances, and related incidental work. <br />The Contract with Hurtado was executed on October 19, 2021, and staff issued the Notice to <br />Proceed on October 27, 2021, which assigned the official start date of construction as November <br />
The URL can be used to link to this page
Your browser does not support the video tag.