Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2023 BPU
>
09-25-2023 BPU
>
09-25-2023 RPT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 10:01:58 AM
Creation date
9/14/2023 10:01:29 AM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
09-25-2023 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2023 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WATER ENERGY LIFE <br />CITY OF <br />RIVERSIDE <br />lag <br />PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: SEPTEMBER 25, 2023 <br />SUBJECT: MULTI -SUBSTATION PROTECTION AND AUTOMATION UPGRADE <br />PROJECTS; WORK ORDER NO. 2403007 IN THE AMOUNT OF $193,000; <br />WORK ORDER NO. 2323918 IN THE AMOUNT OF $260,000; AND WORK <br />ORDER NO. 2402369 IN THE AMOUNT OF $979,000 <br />ISSUES: <br />Consider approval of the capital expenditure for Work Order No. 2403007 in the amount of <br />$193,000 for Springs Substation Bus Differential Relay Upgrade Project, Work Order No. 2323918 <br />in the amount of $260,000 for Harvey Lynn Substation Switchgear 5 Protection and Upgrade <br />Project, and Work Order No. 2402369 in the amount of $979,000 for Orangecrest Substation <br />Switchgear 1 and 2 Protection and Automation Upgrade Project. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Approve the capital expenditure for Work Order No. 2403007 in the amount of $193,000 <br />for Springs Substation Bus Differential Relay Upgrade Project; <br />2. Approve the capital expenditure for Work Order No. 2323918 in the amount of $260,000 <br />for Harvey Lynn Substation Switchgear 5 Protection and Upgrade Project; and <br />3. Approve the capital expenditure for Work Order No. 2402369 in the amount of $979,000 <br />for Orangecrest Switchgear 1 and 2 Protection and Automation Upgrade Project. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) owns, maintains, and operates 17 substations, including three <br />generating substations, 10 distribution substations, three customer substations and one <br />interconnection collector substation. Substations play a crucial role in power delivery systems, <br />ensuring the safe and reliable distribution of electricity from generation facilities to end-users. <br />They serve as vital nodes in the energy infrastructure, facilitating the efficient transmission and <br />distribution of electrical power. Substations provide several key functions that contribute to <br />maintaining the stability and integrity of the power grid such as voltage regulation and <br />transformation, operational switching, monitoring and control, fault isolation, and equipment <br />protection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.