W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />P <br />UB LIC UTILITIES Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: AUGUST 28, 2023 <br />SUBJECT: AWARD BID NO. RPU -8010 FOR THE SPRINGS CIRCUIT RELIABILITY <br />PROJECT — PHASE 1, TO ASPLUNDH CONSTRUCTION, LLC, OF ANAHEIM, <br />CALIFORNIA, IN THE AMOUNT OF $1,999,848.43 PLUS 10% CHANGE <br />ORDER AUTHORITY IN THE AMOUNT OF $199,984.84 AND WORK ORDER <br />NO. 2019648 IN THE AMOUNT OF $3,587,000 <br />ISSUE: <br />Consider awarding Bid No. RPU -8010 to Asplundh Construction, LLC, of Anaheim, California, for <br />the Springs Circuit Reliability Project Phase 1, in the amount of $1,999,848.43 plus 10% change <br />order authority of $199,984.84; and approve the capital expenditure for Work Order No. 2019648 <br />in the amount of $3,587,000. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />Award Bid No. RPU -8010 to Asplundh Construction, LLC of Anaheim, California, in the <br />amount of $1,999,848.43 for the Springs Circuit Reliability Project Phase 1; <br />2. Authorize change order authority to the Asplundh Construction, LLC Construction Contract <br />for 10% of the original contract price, or $199,984.84, for Bid No. RPU -8010; <br />3. Approve the capital expenditure for Work Order No. 2019648 in the amount of $3,587,000 <br />which includes all design, construction, construction support, contract administration, <br />inspection, and construction change order authority costs for the Spring Circuit Reliability <br />Project Phase 1; and <br />4. Authorize the City Manager, or designee, to execute any documents necessary to <br />effectuate the project described herein, as well as the ability to make minor non -substantive <br />changes in alignment with all purchasing policies. <br />BACKGROUND: <br />Springs Substation located on Eastridge Avenue near Box Springs Boulevard currently has one <br />electrical field tie with La Colina Substation located on Central Avenue near Canyon Crest Drive. <br />The circuit tie is in the vicinity of Sycamore Canyon Boulevard and Eastridge Avenue. In the event <br />of a catastrophic failure of the substation transformers or transmission lines at Springs Substation, <br />