Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2023 BPU
>
07-10-2023 BPU
>
07-10-2023 BPU RPT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2023 12:27:07 PM
Creation date
6/29/2023 9:06:32 AM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
07-10-2023 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2023 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />P <br />UB LIC UTILITIES Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: JULY 10, 2023 <br />SUBJECT: PURCHASE ORDER FOR AIR INLET CHILLER MAINTENANCE AND AS <br />NEEDED REPAIRS AT RIVERSIDE ENERGY RESOURCE CENTER WITH <br />TRANE U.S. INC. OF BREA, CALIFORNIA FOR A FOUR-YEAR TERM WITH <br />AN OPTIONAL FIVE-YEAR EXTENSION FOR A TOTAL AMOUNT OF <br />$1,811,491.86 <br />ISSUE: <br />Consider approving an expenditure and issuance of Purchase Order to Trane U.S. Inc. of Brea, <br />California for air inlet chiller maintenance and as needed repairs at Riverside Energy Resource <br />Center for a four-year period with the option to extend for an additional five years in the amount <br />of $1,811,491.86. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Approve an expenditure and issuance of Purchase Order to Trane U.S. Inc. of Brea, <br />California for air inlet chiller maintenance and as needed repairs at Riverside Energy <br />Resource Center for a four-year period with the option to extend for an additional five years <br />in the amount of $1,811,491.86; and <br />2. Approve Work Order No. 2321932 in the amount of $1,001,625.78 (included in the total <br />purchase order in item (1) above) for the RERC air inlet chiller major overhaul project; and <br />3. Approve Work Order No. 2321933 in the amount of $240,924.10 (included in the total <br />purchase order above in item (1) above) for the RERC air inlet chiller controls upgrade <br />project. <br />BACKGROUND: <br />Riverside Public Utilities owns and operates the Riverside Energy Resource Center (RERC). This <br />facility is comprised of four fast -start gas turbines (also referred to as gas units or units) that are <br />strategically located within the city limits and achieve maximum power output in less than 10 <br />minutes. RERC generates 195 megawatts of electricity and serves a critical role in meeting <br />customer demands during peak periods. <br />Each pair of turbines at RERC shares a 3,500 -ton air inlet chiller system. The chiller system for <br />RERC units 1 and 2 was installed in 2004 and the second system for RERC units 3 and 4 was <br />
The URL can be used to link to this page
Your browser does not support the video tag.