Laserfiche WebLink
A A T E R I E N E R G Y I L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />69& <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />GENERAL MANAGER'S REPORT <br />Board Memorandum <br />DATE: APRIL 24, 2023 <br />SUBJECT: RIVERSIDE PUBLIC UTILITIES ELECTRIC CONSULTANT PANEL UPDATE AS <br />OF FEBRUARY 28, 2023 <br />To streamline the bidding process for time -sensitive work, the Board of Public Utilities and the <br />City Council voted to allow an Electric Division Consultant Panel to be established. The use of <br />the Panel is beneficial in meeting deadlines related to design construction work and urgent repair <br />or replacement of facilities. The Consultant Panel is a list of companies that are pre -qualified to <br />perform work on an as -needed basis through a negotiated and City Council -approved master <br />agreement. On October 4, 2022, the City Council approved 13 amendments to the Master <br />Agreement to allow for an additional one-year extension and allow the City Manager to authorize <br />one additional year for a total of two years. This saves time and money by simplifying the bidding <br />process for specific types of routine work. <br />When RPU determines a need to use the Consultant Panel for new design work, the Purchasing <br />Manager sends a bid solicitation with a set of engineering plans and specifications to Panel <br />consultants. Because members of the Consultant Panel have already executed a Master <br />Agreement that includes the general and legal requirements of the contract, only technical aspects <br />of the bid have to be addressed. The Consultant Panel is used for projects that meet the following <br />two criteria: <br />1) RPU Engineering does not have the ability or the resources needed to design the project <br />within the period required; and <br />2) The cumulative value of supplemental agreements per consultant does not exceed $2 <br />million as per the term of the Master Agreement. <br />Projects that deviate from these criteria proceed through the formal bidding process as defined in <br />the Purchasing Resolution. <br />The following tables report activity for 2016-2019 Consultant Panel Update, approved by Board <br />on February 13, 2017 (Attachment 1) and the 2023 Consultant Panel Update approved by Board <br />on October 4, 2022 (Attachment 2). <br />