Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2023 BPU
>
04-10-2023 BPU
>
04-10-2023 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2023 1:10:29 PM
Creation date
3/31/2023 12:58:15 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
04-10-2023 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2023 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />P <br />UB LIC UTILITIES Board Memorandum <br />BOARD OF PUBLIC UTILITIES <br />DATE: APRIL 10, 2023 <br />SUBJECT: AWARD BID SUB -865 FOR FURNISHING BATTERY BANK FOR RIVERSIDE <br />SUBSTATION TO CONCEPT POWER INC. OF LAS VEGAS, NEVADA, IN THE <br />AMOUNT OF $78,849.30; WORK ORDER 2311734 IN THE AMOUNT OF <br />$108,000 FOR RIVERSIDE SUBSTATION BATTERY REPLACEMENT <br />PROJECT <br />16*1411: RI <br />Consider awarding Bid SUB -865 for furnishing flooded battery bank to Concept Power Inc., of Las <br />Vegas, Nevada, in the amount of $78,849.30, and approve the capital expenditure for Work Order <br />No. 2311734 in the amount of $108,000 for the Riverside Substation Battery Replacement Project. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />Award Bid SUB -865 for furnishing flooded battery bank for the Riverside Substation to <br />Concept Power Inc., of Las Vegas, Nevada, in the amount of $78,849.30; <br />2. Approve the capital expenditure for Work Order No. 2311734 in the amount of $108,000 <br />which includes all design, construction, procurement, testing and commissioning and <br />construction support for replace battery at Riverside Substation; and <br />3. Authorize the City Manager, or designee, to execute any documents necessary to <br />effectuate the project described herein, as well as the ability to make minor and non - <br />substantive changes in alignment with all purchasing policies. <br />BACKGROUND: <br />Batteries are critical components of electrical transmission and distribution systems. When faults <br />are detected, batteries provide a reliable source of auxiliary power to the protective relays, which <br />operate circuit breakers. In addition, when station power is lost, batteries provide a consistent <br />source of power to critical systems such as supervisory control and data acquisition (SCADA) and <br />communication equipment, allowing operators to continue operating the system. <br />RPU has standardized the use of vented lead acid -type battery banks to supply this 125 -volt DC <br />requirement for the substations. These vented lead acid battery banks have proven to be very <br />reliable and have low maintenance requirements and an average life span of 15 years. <br />
The URL can be used to link to this page
Your browser does not support the video tag.