Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2023 BPU
>
02-27-2023 BPU
>
02-27-2023 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2023 3:05:10 PM
Creation date
2/16/2023 3:03:43 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
02-27-2023 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2023 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />DATE: FEBRUARY 27, 2023 <br />SUBJECT: AWARD BID NO. RPU -7960 FOR RIVERSIDE TRANSMISSION RELIABILITY <br />PROJECT RIVERSIDE ENERGY RESOURCE CENTER TO FREEMAN LINE <br />69KV MATERIALS HANDLING AND LOGISTICS TO PAR WESTERN LINE <br />CONTRACTORS OF RANCHO CUCAMONGA, CALIFORNIA, IN THE AMOUNT <br />OF $393,325.44; AND WORK ORDER NO. 2311468 FOR A TOTAL CAPITAL <br />EXPENDITURE OF $483,000 <br />ISSUES: <br />Consider awarding Bid No. RPU -7960 for the handling and logistics of materials for the 69kV sub - <br />transmission line work of the Riverside Transmission Reliability Project (RTRP) Riverside Energy <br />Resource Center (RERC) to Freeman Substation to PAR Western Line Contractors, of Rancho <br />Cucamonga, California, in the amount of $393,325.44; and approve Work Order No. 2311468 for <br />the total capital expenditure of $483,000 for the purpose of tracking costs related to RTRP RERC <br />to Freeman 69kV material handling work as part of RTRP Work Order No. 642975. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award a construction contract for Bid No. RPU -7960 for the handling and logistics of <br />materials for the 69kV sub -transmission line work of the RTRP RERC to Freeman <br />Substation to PAR Western Line Contractors, of Rancho Cucamonga, California, in the <br />amount of $393,325.44; <br />2. Authorize the City Manager, or designee, to execute the construction contract, including <br />making minor and non -substantive changes; and <br />3. Approve Work Order No. 2311468 for the total capital expenditure of $483,000 for the <br />purpose of tracking costs related to RTRP RERC to Freeman 69kV material handling work <br />as part of RTRP Work Order No. 642975. <br />BACKGROUND: <br />The RTRP is a joint project with Southern California Edison (SCE) to provide Riverside a second <br />connection to the state electric transmission grid to address the capacity and reliability needs of <br />the city. As part of RTRP, improvements are made to RPU's sub -transmission system within the <br />
The URL can be used to link to this page
Your browser does not support the video tag.