Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2023 BPU
>
01-09-2023 BPU
>
01-09-2023 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 4:35:34 PM
Creation date
12/30/2022 4:06:49 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
01-09-2023 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2023 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br /> <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: JANUARY 9, 2023 <br /> <br />SUBJECT: DONALD AVENUE WATER MAIN REPLACEMENT PROJECT, WORK ORDER <br />NO. 2223436 IN THE AMOUNT OF $721,000 <br />ISSUE: <br />Consider approving Work Order No. 2223436 in the amount of $721,000 for all engineering, <br />construction, paving and construction contingency costs for the Donald Avenue Water Main <br />Replacement Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 2223436 in the total amount of $721,000 <br />for all engineering, construction, paving and construction contingency costs for the Donald <br />Avenue Water Main Replacement Project. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) budgets annually to replace high-priority water pipelines that have <br />reached their end-of-life. An end-of-life determination is based on parameters such as pipeline <br />age, material, and maintenance records via a Business Risk Exposure (BRE) model, which <br />identifies high-risk water distribution pipeline segments needing replacement. The BRE model <br />has proven valuable in identifying and prioritizing water main replacement projects and was <br />presented on October 13, 2021, to the RPU Water Committee. <br />This project ment program to replace old and high- <br />priority water mains. The project area consists of 4-inch Matheson Steel water pipelines installed <br />in . These pipelines have experienced two recorded leaks since 2019. Based on their <br />leak history, age and size, these water pipelines have been ranked as a high priority for <br />replacement to enhance the reliability and fire flow. <br />DISCUSSION: <br />The work generally entails the construction of approximately 620 linear feet of 8-inch Polyvinyl <br />Chloride (PVCO) pipe, 400 linear feet of 12-inch Polyvinyl Chloride (PVCO) pipe, 25 water <br />services, two fire hydrants, and three system connections, along with all necessary fittings, <br />appurtenances, and related incidental w <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.