Laserfiche WebLink
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: DECEMBER 12, 2022 <br />GENERAL MANAGERS REPORT <br /> <br /> <br />SUBJECT: MONTHLY POWER SUPPLY REPORT OCTOBER 31, 2022 <br />Power Usage: <br />Wholesale Load (Vista): 190,752 MWH (Chart 1) <br />Peak Demand: 442 MW of which 243 MW came from RVSD available resources <br />(Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br /> <br />a) Nuclear 6,936 <br /> <br />b) Coal 39,837 <br /> <br />c) Large Hydroelectric 1,227 <br />d) Natural Gas 4,545 <br /> <br />e) Renewables 73,361 <br /> <br />f) Inter SC Trades 37,400 <br /> <br />g) Green Inter SC Trades - <br />h) CAISO Purchases 27,447 <br />Total: 190,752 <br /> <br />Total Green Power Supply 73,361 MWH which yields 38.46% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 71.71% capacity factor for the month. <br /> <br />Coal: IPP units 1 and 2 operated at 39.08% capacity factor for the month. <br />Large Hydro: Hoover, 17 MW, with energy entitlement of 1,227 <br />MWH. <br />Natural Gas: 97.72% for the month. <br />99.87% for the month. <br />100.00% for the month. <br /> <br /> <br />