Home
Clerk
>
City Council/Agency Reports
>
2000s
>
2004
>
March
>
03-23-2004 CC RPT
>
03-23-2004 CC RPT 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2009 1:41:27 PM
Creation date
3/18/2004 7:37:02 PM
Metadata
Fields
Template:
General
General - Type
City Council Reports
General 2 - Date
3/23/2004
Number
12
Document Relationships
03-23-2004 CC AGENDA
(Agenda)
Path:
\City Council Agendas\2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
People Serving <br />People <br /> <br /> Riverside <br />CITY OF RIVERSIDE <br /> <br />CITY COUNCIL MEMORANDUM <br /> <br />HONORABLE MAYOR AND CITY COUNCIL DATE: March 23, 2004 <br /> <br /> ITEM NO: 12 <br /> <br />SUBJECT: BID NO. 6087 - TYLER STREET WIDENING BETWEEN WELLS AVENUE AND MANDALAY <br /> <br />COURT~ SUPPLEMENTAL APPROPRIATION~ FUND TRANSFER AND CONTRACT AWARD <br /> <br />BACKGROUND: <br /> <br />This project will provide for the construction of street improvements on Tyler Street between Wells Avenue <br />and Mandalay Court. The project includes: <br /> <br />1. Widening Tyler Street to provide one lane and a parking lane in each direction and a continuous two-way <br /> left turn lane. <br /> <br />2. Constructing concrete curbs, gutters and sidewalks. <br /> <br />3. Constructing a storm drain in Wells Avenue from Tyler Street to Jones Avenue. <br /> <br />4. Constructing missing sewer laterals. <br /> <br />5. Constructing landscaped medians and new traffic signals a t t he intersections o f Tyler Street with <br /> Gramercy Place, Campbell Avenue, and Keller Avenue. <br /> <br />6. Rehabilitating and/or reconstructing the existing asphalt pavement within the project limits. <br /> <br />7. The undergrounding of the existing overhead power, telephone and cable television lines. <br /> <br />Construction of the overall project is expected to take approximately 19 months. Construction of the street <br />improvements and utility undergrounding will be sequenced to minimize impacts to adjoining residents and <br />businesses. Utility undergrounding along Tyler Street will be phased and will occur in the following sequence: <br />Eureka Street to Cypress Avenue, Cypress Avenue to Campbell Avenue, and Campbell Avenue to Wells <br />Avenue. Each phase of the undergrounding will be completed prior to beginning work on the next phase. <br />Construction of the street improvements will commence following the completion of each phase of utility <br />undergrounding. <br /> <br />Five bids were received for this project on January 28, 2004 (see attached list). The Iow bid of $6,389,938.85 <br />was submitted by Shawnan and is 0.7% over the Engineer's estimate. <br /> <br />12-1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.