Laserfiche WebLink
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE:NOVEMBER 28, 2022 <br />REPORT <br />SUBJECT:RIVERSIDE PUBLIC ELECTRIC CONSULTANT PANEL UPDATE AS OF <br />SEPTEMBER 30, 2022 <br />To streamline the bidding process fortime-sensitivework, the Board of Public Utilities and the <br />City Council voted to allow an Electric Division Consultant Panel to be established.The use of <br />the Panel is beneficial in meeting deadlines related to design construction work and urgent repair <br />or replacement of facilities. The Consultant Panel is a list of companies that are pre-qualified to <br />perform work on an as-needed basis through a negotiated and City Council-approved master <br />agreement.This saves time and money by simplifying the bidding process for specific types of <br />routine work. <br />When RPU determines a need to use the Consultant Panel for new design work, the Purchasing <br />Manager sends a bid solicitation with a set of engineering plans and specifications to Panel <br />consultants.Because members of the Consultant Panel have already executed a Master <br />Agreement that includes the general and legal requirements of the contract, only technical aspects <br />of the bidhave to be addressed.The Consultant Panel is used for projects that meetthe following <br />twocriteria: <br />1)RPU Engineering does not have the ability or the resources needed to design the project <br />within the period required; and <br />2)Thecumulative value of supplemental agreements per consultant does not exceed <br />$2 million as per the term of the Master Agreement. <br />Projectsthat deviate from these criteria proceed through the formal bidding process as defined in <br />the Purchasing Resolution. <br />The following tables report activity for 2016-2019 Consultant Panel Update, approved by Board <br />on February 13, 2017 (Attachment 1) and the 2019 2022 Consultant Panel Updateapproved by <br />Board on June 24, 2019(Attachment 2). <br /> <br />