Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2022 BPU
>
11-14-2022
>
11-14-2022 BPU RPT 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 5:10:27 PM
Creation date
11/9/2022 2:43:09 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
11-14-2022 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2022 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R I E N E R G Y i L I E E <br />P U B L I C U T I L I T I E S <br />RIVERSIDE PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />GENERAL MANAGER'S REPORT <br />Board Memorandum <br />DATE: NOVEMBER 14, 2022 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT — SEPTEMBER 30, 2022 <br />Power Usage: <br />Wholesale Load (Vista): — 252,829 MWH (Chart 1) <br />Peak Demand: — 648 MW of which 522 MW came from RVSD available resources <br />(Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Total Green Power Supply — 67,530 MWH which yields 26.71% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 99.49% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 64.88% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 17 MW, with energy entitlement of 1,584 <br />MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 99.37% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 99.13% for the month. <br />Resource <br />MWH <br />a) <br />Nuclear <br />9,312 <br />b) <br />Coal <br />64,002 <br />c) <br />Large Hydroelectric <br />1,584 <br />d) <br />Natural Gas <br />24,410 <br />e) <br />Renewables <br />67,530 <br />f) <br />Inter SC Trades <br />27,800 <br />g) <br />Green Inter SC Trades <br />- <br />h) <br />CAISO Purchases <br />58,191 <br />Total: <br />252,829 <br />Total Green Power Supply — 67,530 MWH which yields 26.71% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 99.49% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 64.88% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 17 MW, with energy entitlement of 1,584 <br />MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 99.37% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 99.13% for the month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.