Laserfiche WebLink
W A Y E R i E N E it L v i i <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />P U B L I C U i I L 17 I E S <br />BOARD OF PUBLIC UTILITIES DATE: NOVEMBER 14, 2022 <br />SUBJECT: MONTEEL PLACE WATER MAIN REPLACEMENT PROJECT —APPROVAL OF <br />WORK ORDER NO. 2225902 IN THE AMOUNT OF $234,000 <br />ISSUE: <br />Consider approving Work Order No. 2225902 in the amount of $234,000 for all engineering, <br />construction, paving and construction contingency costs for the Monteel Place Water Main <br />Replacement Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 2225902 in the amount of $234,000 for <br />all engineering, construction, paving and construction contingency costs for the Monteel Place <br />Water Main Replacement Project. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) budgets annually to replace high-priority water pipelines that have <br />reached their end -of -life. An end -of -life determination is based on parameters such as pipeline <br />age, material, and maintenance records via a Business Risk Exposure (BRE) model, which <br />identifies high-risk water distribution pipeline segments needing replacement. The BRE model <br />has proven valuable in identifying and prioritizing water main replacement projects and was <br />presented on October 13, 2021, to the RPU Water Committee. <br />The Monteel Place Water Main Replacement Project was identified through the BRE model as an <br />old, high-priority water main needing replacement. The current water pipeline consists of an <br />existing 4 -inch cast iron water pipeline installed in 1963. Since 1997, the pipeline has experienced <br />14 leaks. Replacement of this pipeline will ensure water system reliability and increase fire flow <br />in this area. <br />DISCUSSION: <br />The work generally entails the construction of approximately 435 linear feet of 6 -inch Polyvinyl <br />Chloride (PVCO) pipe, 15 water services, one system connection, and all necessary fittings <br />appurtenances, and related incidental work, which will be installed according to RPU's current <br />standards. The Water Division's field forces will construct the work. Besides routine service tie - <br />overs, there will be no disruption of service. <br />