Laserfiche WebLink
<br /> <br /> <br />2 <br />2 <br /> <br /> <br />20 <br />33 <br /> <br />, <br />4 <br />, <br /> <br />2 <br /> <br />esources <br />r <br />Wholesale Load <br /> <br /> <br /> <br /> <br />SEPTEMBER 12 <br /> <br /> <br />: <br />2 <br />2 <br /> <br />20 <br /> <br />,% of the Total <br />DATE <br />1 <br />% for the month. <br />398 <br />.% for the month. <br /> <br /> <br /> <br />000 <br />. <br />360 <br />. <br />100 <br />JULY <br />MW, with energy entitlement of <br />% capacity factor for the month. <br /> <br /> <br />100 <br /> <br />7 <br />80 <br />.1 <br />5 <br /> <br />9 <br />MW came from RVSD available <br /> <br />% for the month. <br />which yields <br />% capacity factor for the month. <br />481 <br /> <br />00 <br />56 <br />. <br />. <br /> <br />54 <br /> <br />MWH <br />100 <br />- <br /> <br /> <br />Board Memorandum <br />332331 <br />0065 <br /> <br /> <br />MWH (Chart 1)26661140005424 <br />23 <br /> ,,,,,,,, <br />5 <br />2 <br />91 <br />, <br />6514 <br />559146047 <br />1 <br /> <br />MWH <br />4MW of which <br /> 2 <br />9 <br /> <br /> <br /> <br /> <br />7, <br /> <br /> <br />27 <br /> <br />RIVERSIDE PUBLIC UTILITIES 245(Chart 2) <br /> <br /> <br /> <br /> <br />: <br /> Total: <br /> <br /> <br />S REPORT <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MONTHLY POWER SUPPLY REPORT <br /> <br /> <br /> <br />Palo Verde units 1, 2 and 3 operated at IPP units 1 and 2 operated at MWH. <br /> <br /> <br /> <br /> <br />: <br />Resource <br /> <br />Usage: <br /> <br />NuclearCoalLarge HydroelectricNatural GasRenewablesInter SC TradesGreen Inter SC TradesCAISO Purchases <br /> <br /> <br /> <br />)) <br />) <br />f <br />c) <br /> a)b)d)e)gh <br /> <br /> BOARD OF PUBLIC UTILITIES GENERAL MANAGERSUBJECT Power Wholesale Load (Vista): Peak Demand: RVSD Energy Mix (Chart 1) Total Green Power Supply Requirement Resource Availability: <br /> Nuclear: Coal: Natural Gas: <br /> <br />