Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2022 BPU
>
08-08-2022
>
08-08-2022 BPU RPT 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 1:45:43 PM
Creation date
7/29/2022 5:08:45 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
08-08-2022 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2022 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br /> <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: AUGUST 8, 2022 <br /> <br />SUBJECT: AWARD BID NO. RPU-7916 FOR THE GIBRALTAR DRIVE CABLE <br />REPLACEMENT PROJECT TO E. E. ELECTRIC, INC., OF JURUPA VALLEY, <br />CALIFORNIA IN THE AMOUNT OF $348,754.25; WORK ORDER NO. 1910967 <br />IN THE AMOUNT OF $509,000 <br />ISSUES: <br />Consider awarding Bid No. RPU-7916 for the Gibraltar Drive Cable Replacement Project to E. E. <br />Electric, Inc., of Jurupa Valley, California, in the amount of $348,754.25; and approve the capital <br />expenditure for Work Order No. 1910967 in the amount of $509,000. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award Bid No. RPU-7916 for the Gibraltar Drive Cable Replacement Project to E. E. Electric, <br />Inc., of Jurupa Valley, California, in the amount of $348,754.25; <br /> <br />2. Approve the capital expenditure for Work Order No. 1910967 in the amount of $509,000, <br />which includes all design, construction, construction support, contract administration, <br />inspection, and construction change order authority costs for the Gibraltar Drive Cable <br />Replacement Project; and <br /> <br />3. Authorize the City Manager, or designee, to execute any documents necessary to <br />effectuate the project described herein, as well as the ability to make minor non-substantive <br />changes in alignment with all purchasing policies. <br />BACKGROUND: <br />Riverside Public Utilities (RPU) has experienced reliability issues with CIC-type (cable-in-conduit) <br />infrastructure for the last 20 years, due to the high failure rate of aged cable, responsible for 70% <br /> The area of this project is served by CIC. The Electric System Master <br />Plan (ESMP) recommends the planned replacement of obsolete CIC-type infrastructure to <br />improve system capacity and reliability. <br />This project will replace existing deteriorated underground substructures and cable with new <br />underground electrical distribution facilities to improve the electric service to customers in the <br />area, improving overall electric system reliability and safety. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.