Laserfiche WebLink
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: JULY 11, 2022 <br />GENERAL MANAGERS REPORT <br /> <br /> <br />SUBJECT: MONTHLY POWER SUPPLY REPORT May 31, 2022 <br />Power Usage: <br />Wholesale Load (Vista): 176,278 MWH (Chart 1) <br />Peak Demand: 387 MW of which 234 MW came from RVSD available resources <br />(Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br /> <br />a) Nuclear 7,897 <br /> <br />b) Coal 18,937 <br /> <br />c) Large Hydroelectric 3,324 <br />d) Natural Gas 1,701 <br /> <br />e) Renewables 100,889 <br /> <br />f) Inter SC Trades 42,348 <br /> <br />g) Green Inter SC Trades - <br />h) CAISO Purchases 1,272) <br />Total: 176,278 <br /> <br />Total Green Power Supply 100,889 MWH which yields 57.23% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 81.65% capacity factor for the month. <br /> <br />Coal: IPP units 1 and 2 operated at 18.58% capacity factor for the month. <br />20 MW, with energy entitlement of 3,234 <br />MWH. <br />Natural Gas: 100.00% for the month. <br />72.08% for the month. <br />100.00% for the month. <br /> <br /> <br />