Laserfiche WebLink
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: MAY 9, 2022 <br />GENERAL MANAGERS REPORT <br /> <br /> <br />SUBJECT: MONTHLY POWER SUPPLY REPORT March 31, 2022 <br />Power Usage: <br />Wholesale Load (Vista): 163,624 MWH (Chart 1) <br />Peak Demand: 326 MW of which 215 MW came from RVSD available <br />resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br /> <br />a) Nuclear 9,491 <br /> <br />b) Coal 9,484 <br /> <br />c) Large Hydroelectric 3,126 <br />d) Natural Gas 3,315 <br /> <br />e) Renewables 94,079 <br /> <br />f) Inter SC Trades 42,350 <br /> <br />g) Green Inter SC Trades - <br />h) CAISO Purchases 1,779 <br />Total: 163,624 <br /> <br />Total Green Power Supply 94,079 MWH which yields 57.50% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 98.13% capacity factor for the month. <br /> <br />Coal: IPP units 1 and 2 operated at 9.30% capacity factor for the month. <br />pacity entitlement was 20 MW, with energy entitlement of 3,126 <br />MWH. <br />Natural Gas: 9.68% for the month. <br />99.95% for the month. <br />100.00% for the month. <br /> <br />Renewable: CALPPA units operated at 95.63% capacity factor for the month. <br /> <br />