Laserfiche WebLink
WATER I ENERGY I LIE E <br />P U B L I C u TIL 1 f I F S <br />RIVERSIDE PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />GENERAL MANAGER'S REPORT <br />CI IR IF(_T <br />Power Usage: <br />Board Memorandum <br />DATE: APRIL 11, 2022 <br />MONTHLY POWER SUPPLY REPORT — FEBRUARY 28, 2022 <br />Wholesale Load (Vista): <br />Peak Demand: <br />resources (Chart 2) <br />RVSD Energy Mix (Chart 1)- <br />a) <br />b) <br />C) <br />d) <br />e) <br />f) <br />g) <br />h) <br />Resource <br />Nuclear <br />Coal <br />Large Hydroelectric <br />Natural Gas <br />Renewables <br />Inter SC Trades <br />G I t SC T d <br />148,268 MWH (Chart 1) <br />283 MW of which 187 MW came from RVSD available <br />MWH <br />7,872 <br />13,550 <br />1,864 <br />1,549 <br />75,188 <br />33,600 <br />reen n er ra es - <br />CAISO Purchases 14,644 <br />Total: 148,268 <br />Total Green Power Supply — 75,188 MWH which yields 50.71% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 90.11 % capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 14.72% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 18 MW, with energy entitlement of 1,864 <br />MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 98.68% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: CALPPA units operated at 86.63% capacity factor for the month. <br />