Laserfiche WebLink
WATER I ENERGY I IL4EE <br />P U B L I C urs <br />RIVERSIDE PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />GENERAL MANAGER'S REPORT <br />CI IR IG(_T <br />Power Usage: <br />Board Memorandum <br />DATE: MARCH 14, 2022 <br />MONTHLY POWER SUPPLY REPORT — January 31, 2022 <br />Wholesale Load (Vista): <br />Peak Demand: <br />resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />a) <br />b) <br />C) <br />d) <br />e) <br />f) <br />g) <br />h) <br />Resource <br />Nuclear <br />Coal <br />Large Hydroelectric <br />Natural Gas <br />Renewables <br />Inter SC Trades <br />G I t SC T d <br />161,989 MWH (Chart 1) <br />270 MW of which 242 MW came from RVSD available <br />MWH <br />8,688 <br />15,626 <br />1,961 <br />1,204 <br />68,766 <br />55,800 <br />reen n er ra es - <br />CAISO Purchases 9,944 <br />Total: 161,989 <br />Total Green Power Supply — 68,766 MWH which yields 42.45% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 89.83% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 15.33% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 18 MW, with energy entitlement of 1,961 <br />MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 94.32% for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />