Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2022 BPU
>
02-28-2022
>
02-28-2022 BPU RPT 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 8:45:38 AM
Creation date
2/25/2022 8:45:36 AM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
02-28-2022 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2022 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: FEBRUARY 28, 2022 <br /> REPORT <br />SUBJECT: RIVERSIDE PUBLIC UTILITIES ELECTRIC PANEL UPDATE <br />AS OF DECEMBER 31, 2021 <br />To streamline the bidding process for routine work, the Board of Public Utilities and City Council <br />approved an to be established. The use of the Panel is <br />beneficial in meeting deadlines related to construction work and urgent repair or replacement of <br />qualified to perform work on <br />an asneeded basis through a master agreement. This saves time and money by simplifying the <br />bidding process for specific types of routine work. <br />maintenance, repair, modification, or extension of work, the Purchasing Manager sends a bid <br />solicitation with a set of engineering plans and specifications to the appropriate Panel contractors. <br />includes the general and legal requirements of the contract, they only have to address the <br />technical aspects of t <br />three criteria: 1) Construction of the project needs to start within two months from start of design; <br />2) Project cost is less than $500,000; and 3) City forces do not have the ability or the resources <br />needed to construct the project within the time frame required. Projects that deviate from these <br />criteria proceed through the formal bidding process. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.