Laserfiche WebLink
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: FEBRUARY 14, 2022 <br />GENERAL MANAGERS REPORT <br /> <br /> <br />SUBJECT: MONTHLY POWER SUPPLY REPORT - December 31, 2021 <br />Power Usage: <br />Wholesale Load (Vista): 170,068 MWH (Chart 1) <br />Peak Demand: 293 MW of which 218 MW came from RVSD available <br />resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource MWH <br /> <br />a) Nuclear 8,976 <br /> <br />b) Coal 30,666 <br /> <br />c) Large Hydroelectric 1,538 <br />d) Natural Gas 1,397 <br /> <br />e) Renewables 73,296 <br /> <br />f) Inter SC Trades 39,400 <br /> <br />g) Green Inter SC Trades - <br />h) CAISO Purchases 14,795 <br />Total: 170,068 <br /> <br />Total Green Power Supply 73,296 MWH which yields 43.10% of the Total Wholesale Load <br />Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 92.80% capacity factor for the month. <br /> <br />Coal: IPP units 1 and 2 operated at 30.09% capacity factor for the month. <br />17 MW, with energy entitlement of 1,538 <br />MWH. <br />Natural Gas: 55.41% for the month. <br />97.31% for the month. <br />93.78% for the month. <br /> <br /> <br /> <br />