Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2022 BPU
>
01-10-2022
>
01-10-2022 BPU RPT 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:16:17 PM
Creation date
12/30/2021 10:29:42 AM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
01-10-2022 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2022 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: JANUARY 10, 2022 <br /> REPORT <br /> <br />SUBJECT: ELECTRIC PANEL UPDATE AS OF OCTOBER 31, 2021 <br />To streamline the bidding process for routine work, the Board of Public Utilities and City Council <br />voted to allow an to be established. The use of the Panel is <br />beneficial in meeting deadlines related to construction work and urgent repair or replacement of <br />qualified to perform work on <br />an asneeded basis through a Master Agreement. This saves time and money by simplifying the <br />bidding process for specific types of routine work. <br />maintenance, repair, modification, or extension of work, the Purchasing Manager sends a bid <br />solicitation with a set of engineering plans and specifications to the appropriate Panel <br />contractors. M <br />includes the general and legal requirements of the contract. The solicitation bid specifications <br />identify the technical aspects of the project or service to be provided <br />used for projects that meet the following three criteria: 1) Construction of the project needs to <br />start within two months from start of design; 2) Project cost is less than $500,000; and 3) City <br />forces do not have the ability or the resources needed to construct the project within the time <br />frame required. Projects that deviate from these criteria proceed through the formal bidding <br />process. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.