Laserfiche WebLink
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: DECEMBER 13, 2021 <br /> <br />GENERAL MANAGER’S REPORT <br /> <br /> <br />SUBJECT: RIVERSIDE PUBLIC UTILITIESELECTRIC CONTRACTORS’ PANEL UPDATE <br />AS OF SEPTEMBER 30, 2021 <br />To streamline the bidding process for routine work, the Board of Public Utilities and City Council <br />voted to allow an Electric Division Contractors’ Panel to be established. The use of the Panel is <br />beneficial in meeting deadlines related to construction work and urgent repair or replacement of <br />facilities. The Contractors’ Panel is a list of companies that are pre-qualified to perform work on <br />an as-needed basis through a master agreement. This saves time and money by simplifying the <br />bidding process for specific types of routine work. <br /> <br />When RPU determines a need to use the Contractors’ Panel for new construction, installation, <br />maintenance, repair, modification, or extension of work, the purchasing manager sends a bid <br />solicitation with a set of engineering plans and specifications to the appropriate Panel <br />contractors. Because members of the Contractors’ Panel have already executed a Master <br />Agreement that includes the general and legal requirements of the contract, they only have to <br />address the technical aspects of the bid. The Contractors’ Panel is used for projects that meet <br />the following three criteria: 1) Construction of the project needs to start within two months from <br />start of design; 2) Project cost is less than $500,000; and 3) City forces do not have the ability or <br />the resources needed to construct the project within the time frame required. Projects that <br />deviate from these criteria proceed through the formal bidding process. <br /> <br /> <br />