Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2021 BPU
>
10-25-2021
>
10-25-2021 BPU RPT 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 10:19:25 AM
Creation date
10/14/2021 10:19:20 AM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
10-25-2021 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2021 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: October 25, 2021 <br /> REPORT <br /> <br />SUBJECT: RIVERSIDE PUBLIC UTILITIES ELECTRIC CONTRACTORS PANEL UPDATE <br />AS OF AUGUST 31, 2021 <br />To streamline the bidding process for routine work, the Board of Public Utilities on April 24, <br />2018, recommended to the City Council approval to adopt a resolution and formation of the <br />Electric Division el. On June 5, 2018, City Council approved the Electric <br /> Master Agreement, Resolution waiving the formal competitive procurement <br />requirements, award utility construction projects under $500,000 and authorize City Manager or <br />his designee to execute Master agreements. The use of the Panel is beneficial in meeting <br />deadlines related to construction work and urgent repair or replacement of facilities. The <br />qualified to perform work on an asneeded <br />basis through a master agreement. This saves time and money by simplifying the bidding <br />process for specific types of routine work. <br />stallation, <br />maintenance, repair, modification, or extension of work, a bid solicitation with a set of <br />engineering plans and specifications are sent to the appropriate Panel contractors by the <br />ve already executed a <br />Master Agreement that includes the general and legal requirements of the contract, they only <br />is used for projects that <br />meet the following three criteria: 1) Construction of the project needs to start within two months <br />from start of design; 2) Project cost is less than $500,000; and 3) City forces do not have the <br />ability or the resources needed to construct the project within the time frame required. Projects <br />that deviate from these criteria proceed through the formal bidding process. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.