Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2021 BPU
>
10-25-2021
>
10-25-2021 BPU RPT 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 10:56:20 AM
Creation date
10/14/2021 9:41:14 AM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
10-25-2021 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2021 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: OCTOBER 25, 2021 <br />th <br />SUBJECT: IMPROVEMENTS TO THE MISSION SQUARE BUILDING, 5 FLOOR <br />CREATION OF A GENDER-INCLUSIVE RESTROOM AUTHORIZE WORK <br />ORDER NO. 2002620 FOR $56,000 <br />ISSUE: <br />Consider the authorizing Work Order No. 2002620 in the amount of $56,000 for improvement to <br />th <br />the Mission Square Building, 5 Floor for a single person American with Disability Act accessible <br />restroom. <br />RECOMMENDATION: <br />That the Board of Public Utilities authorize the capital expenditure for Work Order No. 2002620 <br />for improvement to the Mission Square Building, 5th Floor for a single person restroom, in the <br />amount of $56,000. <br /> <br />BACKGROUND: <br />On October 13, 2015, the City acquired the Mission Square Building at 3750 University Avenue <br />(Property), which was funded by Riverside Public Utilities (RPU). As such, RPU is now the <br />Landlord of the Property. The Property consists of approximately 127,533 square feet of rentable <br />office and retail space in a six-story building, plus a basement level and a 490-parking stall garage <br />situated on approximately 2.5 acres of land. <br />DISCUSSION: <br />The construction component of the work, beginning in 2020, included the demolition of the former <br />janitorial closet and the buildout of a single person American with Disability Act (ADA) accessible <br />restroom. The added restroom provides onsite building staff a restroom they may access. The <br />contractor met all the terms of the agreement and the project is completed and in operation. <br />On July 16, 2020, an informal bid was issued requesting proposals for the construction of an ADA <br />th <br />compliant restroom on the Mission Square 5 Floor, located at 3750 University Avenue. The <br />informal bid provided a link to download the previously approved construction plans for the work <br />to be contracted. The informal bid was conducted pursuant to the City of Riverside guidelines <br />and in coordination with the Finance Department/Purchasing Division. The informal bid was sent <br />to five contractors that have all preformed services for the City in the past. Three contractors <br />responded to the bid; two were non-responsive. The results of the bid are listed below: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.