Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2021 BPU
>
10-25-2021
>
10-25-2021 BPU RPT 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 10:56:23 AM
Creation date
10/14/2021 9:33:31 AM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
10-25-2021 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2021 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br /> <br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: OCTOBER 25, 2021 <br /> <br />SUBJECT: SERVICES AGREEMENT WITH SIEMENS INDUSTRY, INC. OF BUFFALO <br />GROVE, ILLINOIS FOR ROUTINE ELECTRICAL MAINTENANCE FOR A FIVE- <br />YEAR TERM WITH TWO OPTIONAL ONE-YEAR EXTENSIONS AT RIVERSIDE <br />ENERGY RESOURCE CENTER, SPRINGS, AND CLEARWATER POWER <br />PLANTS IN THE AMOUNT OF $1,977,716 <br />ISSUES: <br />Consider approval of a Services Agreement with Siemens Industry, Inc. of Buffalo Grove, Illinois <br />to perform routine electrical maintenance for a five-year term with two optional one-year <br />extensions at Riverside Energy Resource Center, Springs, and Clearwater Power Plants in the <br />amount of $1,977,716. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Approve a Services Agreement with Siemens Industry, Inc. of Buffalo Grove, Illinois for a <br />five-year term with the option of two one-year extensions to perform routine electrical <br />maintenance at Riverside Energy Resource Center, Springs, and Clearwater Power Plants <br />in the amount of $1,977,716; and <br /> <br />2. Authorize the City Manager, or designee, to execute the Agreement with Siemens Industry, <br />Inc., including the two optional one-year extensions, and make any minor non-substantive <br />changes. <br /> <br /> <br />BACKGROUND: <br />Over 590 electrical devices, that include switchgear, breakers, protective relays, and <br />transformers, are used throughout Riverside Public <br />Energy Resource Center (RERC), Springs, and Clearwater Power Plant. The different electrical <br />devices have their recommended maintenance intervals that range from inspections to <br />specialized testing and analysis. Specialized testing, usually performed on a four- or five-year <br />interval, assesses the overall condition of the equipment. <br />The electrical equipment at RERC, Springs and Clearwater vary in age and duty cycle. Springs <br />is the oldest power plant and has been operating for 19 years. Clearwater has been in operation <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.