Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2021 BPU
>
06-14-2021
>
06-14-2021 BPU RPT 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2021 12:09:12 AM
Creation date
6/4/2021 8:25:26 AM
Metadata
Fields
Template:
General
Document Relationships
06-14-2021 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2021 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WATER I ENERGY I LIF E <br />r� <br />PUBLIC UTILITIES <br />RIVERSIDE PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />GENERAL MANAGER'S REPORT <br />CIIR_I1=rT <br />Power Usage: <br />Board Memorandum <br />DATE: JUNE 14, 2021 <br />MONTHLY POWER SUPPLY REPORT — April 30, 2021 <br />Wholesale Load (Vista): — <br />Peak Demand: — <br />resources (Chart 2) <br />RVSD Energy Mix (Chart 1): <br />Resource <br />a) Nuclear <br />b) Coal <br />c) Large Hydroelectric <br />d) Natural Gas <br />e) Renewables <br />f) Inter SC Trades <br />g) Green Inter SC Trades <br />h) CAISO Purchases <br />Total <br />Total Green Power Supply — <br />Requirement <br />Resource Availability: <br />158,400 MWH (Chart 1) <br />386 MW of which 243 MW came from RVSD available <br />MWH <br />7,056 <br />15,248 <br />3,445 <br />3,574 <br />84,703 <br />37,600 <br />F _772 <br />1 00,4uu <br />84,703 MWH which yields 53.47% of the Total Wholesale Load <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 97.12% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 28.69% capacity factor for the month. <br />Large Hydro: Hoover, RVSD's capacity entitlement was 20 MW, with energy entitlement of 3,049 <br />MWH. <br />Natural Gas: Clearwater's availability was 100.00% for the month. <br />RERC's (Units 1, 2, 3 and 4) availability was 99.71 % for the month. <br />Springs's (Units 1, 2, 3 and 4) availability was 100.00% for the month. <br />Renewable: CALPPA units operated at 84.41 % capacity factor for the month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.