Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2021 BPU
>
05-10-2021
>
05-10-2021 BPU RPT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2021 4:40:50 PM
Creation date
4/29/2021 4:40:49 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
05-10-2021 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2021 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
<br /> RIVERSIDE PUBLIC UTILITIES <br /> Board Memorandum <br /> <br />BOARD OF PUBLIC UTILITIES DATE: MAY 10, 2021 <br /> <br />SUBJECT: BID NO. RPU-7818 FOR PURCHASE OF TUBULAR STEEL STRUCTURES FOR <br />THE 69KV RERC TO FREEMAN SUBTRANSMISSION LINE OF THE <br />RIVERSIDE TRANSMISSION RELIABILITY PROJECT (RTRP) WITH WIRELESS <br />STRUCTURES CONSULTING, INC. IN THE AMOUNT OF $666,680 PLUS A 20% <br />CONTRACT CONTINGENCY IN THE AMOUNT OF $133,336 FOR A TOTAL <br />CONTRACT COST NOT TO EXCEED $800,016; AND APPROVAL OF WORK <br />ORDER NO. 2117630 FOR A TOTAL CAPITAL EXPENDITURE OF $995,016 <br />ISSUES: <br />Consider the award of Bid No. RPU-7818 for the purchase of tubular steel structures for the 69kV <br />RERC to Freeman line portion of Riverside Transmission Reliability Project to Wireless Structures <br />Consulting, Inc., of Salem, Oregon, in the amount of $666,680; approve contract contingency of <br />20% in the amount of $133,336 for a total contract cost not to exceed $800,016; and approve <br />Work Order No. 2117630 for the total capital expenditure of $995,016 for the purpose of tracking <br />costs of steel pole structures for 69kV RERC-Freeman line as part of RTRP Work Order No. <br />642975 <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br /> <br />1. Deem the bid from TransAmerican Power Poles for RPU-7818 to be a non-responsive <br />bid; <br /> <br />2. Award Bid No. RPU-7818 for the purchase of tubular steel structures as part of the <br />Riverside Transmission Reliability Project (RTRP) for 69kV RERC to Freeman line to <br />Wireless Structures Consulting, Inc., of Salem, Oregon, in the amount of $666,680; <br />3. Authorize staff to issue change orders in an amount up to 20% of the original contract <br />amount, or $133,336, for a total contract cost not to exceed $800,016; and <br /> <br />4. Approve Work Order No. 2117630 for the total capital expenditure of $995,016 for the <br />purpose of tracking costs of tubular steel structures for 69kV RERC-Freeman line as part <br />of RTRP Work Order No. 642975. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.