Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2021 BPU
>
03-08-2021
>
03-08-2021 BPU RPT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:49:54 PM
Creation date
2/25/2021 2:39:32 PM
Metadata
Fields
Template:
General
Department
City Clerk
General - Type
Agendas
Document Relationships
03-08-2021 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2021 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
WATER i E E R G Y L[ EE <br />11-n�m 69& RIVERSIDE PUBLIC UTILITIES <br />P U B LIC UTILITIES Board Memorandum <br />BOARD OF PUBLIC UTILITIES DATE: MARCH 8, 2021 <br />SUBJECT: UPDATE ON THE MISSION INN BOOSTER STATION AND PRESSURE <br />REZONING PROJECT <br />ISSUE: <br />Receive an update on the Mission Inn Booster Station and Pressure Rezoning Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities receive an update on the Mission Inn Booster Station and <br />Pressure Rezoning Project. <br />BACKGROUND: <br />The Mission Inn Booster Station and Pressure Rezoning Project addresses issues of low water <br />pressure, insufficient fire flow, booster station operational deficiencies and aged and undersized <br />water mains within portions of the surrounding Mount Rubidoux and Indian Hill neighborhoods. <br />The Project includes replacement of the existing Rubidoux and Mary Evans Booster Stations with <br />the new Mission Inn Booster Station and consolidating the Rubidoux 1066, Mary Evans 1150, and <br />portions of the Gravity 997 hydraulic pressure zones into one pressure zone. The project also <br />includes the installation of approximately 5,120 linear feet of pipeline to facilitate the consolidation <br />of the pressure zones. <br />The work of this project was completed under two separate construction contracts, one for the <br />booster station and one for the pipeline, each awarded by the Riverside Board of Public Utilities <br />(Board) on September 23, 2019, for a total project cost of $5,745,000. <br />DISCUSSION: <br />Construction of the pipeline was completed in August 2020, and the booster station was placed <br />in operation in October 2020, with some incidental work continuing through February 2021. Staff <br />will provide the attached presentation to update the Board on this vital RPU project. <br />FISCAL IMPACT: <br />There is no fiscal impact related to this update. <br />
The URL can be used to link to this page
Your browser does not support the video tag.