<br />RIVERSIDE PUBLIC UTILITIES <br /> <br />Board Memorandum <br /> <br />▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ <br />BOARD OF PUBLIC UTILITIES DATE: DECEMBER 22, 2020 <br /> ITEM NO: 7 <br /> <br />SUBJECT: CONSTRUCTION OF THE GARFIELD AND OVERLAND WATER MAIN <br />REPLACEMENT PROJECT (PHASE I) – WORK ORDER NO. 1603765 IN THE <br />AMOUNT OF $1,128,000 <br /> <br /> <br />ISSUE: <br /> <br />Consider approval of Work Order No. 1603765 in the total amount of $1,128,000 for all <br />engineering, construction, paving and construction contingency costs for the Garfield and <br />Overland Water Main Replacement Project (Phase I). <br /> <br /> <br />RECOMMENDATION: <br /> <br />That the Board of Public Utilities approve Work Order No. 1603765 in the total amount of <br />$1,128,000 for all engineering, construction, paving and construction contingency costs for the <br />Garfield and Overland Water Main Replacement Project (Phase I). <br /> <br /> <br />BACKGROUND: <br /> <br />The Garfield and Overland Water Main Replacement Project (Phase I) is part of Riverside Public <br />Utilities’ (RPU) ongoing water main replacement program to replace high priority water mains <br />deemed to be at end of it useful life. The project area consists of existing 6-inch cast iron water <br />mains that were installed in the 1950’s. Based on their leak history, age and size, these water <br />pipelines have been identified as high priority pipelines for replacement to enhance the reliability <br />of the water system. <br /> <br />This project is in line with RPU’s infrastructure road map and Utility 2.0 and the commitment to <br />infrastructure reliability in the Riverside 2025 strategic plan and directly benefits RPU water <br />customers within the vicinity of the project in terms of system reliability and fire flow. <br /> <br /> <br />DISCUSSION: <br /> <br />The work generally entails the construction of approximately 2,900 linear feet of 8-inch polyvinyl <br />chloride (PVC) pipe, 53 water services, nine (9) fire hydrants and eight (8) system connections, <br />along with all necessary fittings, appurtenances and related incidental work. The new water <br />facilities will be installed according to RPU’s current standards. <br />