Home
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2020 BPU
>
12-22-20
>
12-22-20 BPU RPT 24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 4:50:14 PM
Creation date
12/10/2020 4:50:13 PM
Metadata
Fields
Template:
General
General - Type
Agendas
Document Relationships
12-22-2020 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2020 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
ACWA Association of California Water Agencies FTR Firm Transmission Rights PL <br />AF Acre Feet GFT General Fund Transfer PLR <br />AMR Automated Meter Reading GHG Green House Gas PM 10 <br />AMWA Association of Mettopolitan Water Agencies GIS Geographic Information System POU <br />APPA American Public Power Association GMC Grid Management Charge PTO <br />AQMD Air Quality Management District HMPE High Molecular Weight Poly Ethylene PV <br />AWWA American Water Works Association IOU Investor Owned Utility QF <br />BES Bulk Electric System IPA Intermountain Power Agency RA <br />BPA Bonneville Power Administration IPP Intermountain Power Project RAR <br />CADME Computer Aided Design Mapping Engineering IRP Integrated Resource Plan REPI Renewable Energy Production Incentives <br />CAISO California Indepdendent System Operator ISO Independent System Operator RERC <br />CARB California Air Resources Board IT Information Technology RMC <br />CDWR California Department of Water Resources JPA Joint Powers Agency RMR <br />CEC California Energy Commission KPI Key Performance Indicator RPS <br />CEQA California Environmental Quality Act kVA Kilovolt Amps (transformer size)RPU <br />CFTC Commodities & Futures Trading Commission kW Kilowatt RTO <br />CIP Capital Improvement Plan kWh Kilowatt hours RTRP <br />CIS Customer Information System LMP Locational Marginal Pricing SAIDI <br />CMRC California-Mexico Reliability Coordinator LSE Load Serving Entity SAIFI <br />CMUA Calif. Municipal Utilities Association MCP Market Clearing Price SC <br />CPUC Calif. Public Utilities Commission MGD Million Gallons per Day SCADA <br />CREB Clean Renewable Energy Bonds MMbtu Million British Thermal Units SCAQMD <br />CRR Congestion Revenue Rights MRTU Market Redesign Technology Update SCE <br />CTA Competitive Transition Account MSS Metered Subsystem SCPPA <br />CTC Competitive Transition Charge MTM Market-to-Market SEER <br />DA Distribution Automation MVA Megavolt Amps (substation transformer size)SMD <br />DBCP Dibromochloropropane MW Megawatt SONET <br />DOE United States Department of Energy MWh Megawatt Hours SONGS <br />DSC Debt Service Coverage NCPA Northern California Power Agency T&D <br />DSM Demand Side Management NERC North American Electric Reliability Corporation TAC <br />EGF Electric Generating Facility NPDES National Pollution Discharge Elimination System TES <br />EIA Energy Information Agency NRC Nuclear Regulatory Commission TOU <br />EIR Environmental Impact Report ODMS Operational Data Management System TRR <br />EMF Electric Magnetic Fields OH Overhead UDC <br />EOC Emergency Operations Center O&M Operation and Maintenance UFE <br />EPA Environmental Protection Agency OMS Outage Management System UG <br />EPAct Energy Policy Act of 2005 PAC Power Agency of California UOC Utilities Operations Center <br />ERC Emission Reduction Credits PBC Public Benefits Charge WOMS/SPL Work Order Management System <br />ESP Electric Service Provider PCAC Power Cost Adjustment Clause WECC Western Electricity Coordinating Council <br />FERC Federal Energy Regulatory Commission PGA Participating Generator Agreement WSPP <br />PIRP Participating Intermittent Resource Program WMSFRAC <br />MOO <br />Standard Market Design <br />Resource Adequacy <br />Scheduling Coordinator <br />Supervisory Control and Data Acquistion <br />Renewable Portfolio Standard <br />Flexible Resource Adequacy Capacity Must <br />Offer Obligation <br />Underground <br />Transmission & Distribution <br />Transmission Access Charge <br />Riverside Public Utility Electric / Water Utility Acronyms <br />Western Systems Power Pool <br />Work Management System <br />Time of Use <br />Transmission Revenue Requirement <br />Regional Transmission Organization <br />Riverside Transmission Reliability Project <br />Riverside Public Utilities <br />Resource Adequacy Requirements <br />Riverside Energy Resource Center <br />Publicly Owned Utility <br />Private Letter Ruling <br />Particulate Matter 10 microns or less <br />Reliability Must Run <br />Photovoltaic <br />Qualifing Facility <br />Risk Management Committee <br />Participating Transmission Owner <br />Seasonal Energy Efficiency Rating <br />Synchronous Optical Networking <br />Utility Distribution Company <br />San Onofre Nuclear Generating Station <br />Thermal Energy Storage <br />System Average Interruption Duration Index <br />System Average Interruption Frequency Index <br />Unaccounted For Energy <br />Southcoast Air Quality Management District OR AQMD <br />Southern California Edison <br />Southern Cal. Public Power Authority <br />Item 24
The URL can be used to link to this page
Your browser does not support the video tag.