Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2020 BPU
>
12-14-20
>
12-14-2020 BPU RPT 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 5:14:58 AM
Creation date
12/7/2020 4:39:05 AM
Metadata
Fields
Template:
General
Document Relationships
12-14-2020 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2020 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />P U B L I C U T I L I T I E S <br />RIVERSIDE PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES <br />SUBJECT: PLAZA SUBSTATION <br />445 — WORK ORDER <br />OF $4,450,000 <br />ISSUE: <br />Board Memorandum <br />DATE: DECEMBER 14, 2020 <br />ITEM NO: 2 <br />4kV TO 12kV MAKE-READY FOR CIRCUITS 444 AND <br />NO. 1904777 FOR A TOTAL CAPITAL EXPENDITURE <br />Consider the approval of Work Order No. 1904777 for a total capital expenditure of $4,450,000 <br />for the Plaza Substation Make -Ready for Circuits 444 and 445 Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 1904777 for a total capital expenditure <br />of $4,450,000 for the Plaza Substation 4kV to 12kV Make -Ready for Circuits 444 and 445 Project. <br />BACKGROUND: <br />The Electric System Master Plan (ESMP) recommends the conversion of all remaining 4kV <br />distribution circuits to 12kV to improve system capacity and reliability. The work contemplated in <br />Work Order No. 1904777 focuses on overhead facilities. In preparation for the upcoming voltage <br />conversion of Circuits 444 and 445 out of Plaza Substation, the replacement of existing <br />deteriorated poles and aging infrastructure is required to make the circuits ready for future <br />conversion work. The aging infrastructure includes facilities such as overhead wires, insulators, <br />cross -arms, transformers, and other associated electrical distribution facilities that have outlived <br />their useful life. <br />A separate project to convert and upgrade the existing 4kV electrical distribution system to a 12kV <br />system is currently under design and is not part of Work Order 1904777 considered here. That <br />design will include plans and specifications for the installation of underground facilities, including <br />vaults, trenching, conduits and street paving. These underground civil facilities are required to <br />complete the 4kV to 12kV voltage conversion. Staff will return to the Board of Public Utilities to <br />seek approval to award a contract to construct civil work and associated electrical facilities at later <br />time, after the design and contract bid documents are complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.