Laserfiche WebLink
W A T E R E N E R G Y I L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: SEPTEMBER 28, 2020 <br />ITEM NO: 5 <br />SUBJECT: BID NO. RPU -7759 FOR THE CONSTRUCTION OF THE MAGNOLIA AVENUE <br />TECHITE PIPE REPLACEMENT PROJECT (HARRISON STREET TO VAN <br />BUREN BOULEVARD) WITH C.P. CONSTRUCTION CO., INC., IN THE AMOUNT <br />OF $3,705,500 INCLUDING A 10% OR $370,550 CHANGE ORDER AUTHORITY <br />AND WORK ORDER NO. 2011305 IN THE AMOUNT OF $5,058,000 <br />ISSUES: <br />Consider the award of Bid No. RPU -7759 to C.P. Construction Co., Inc. for the construction of the <br />Magnolia Avenue Techite Pipe Replacement Project (Harrison Street to Van Buren Boulevard) in <br />the amount of $3,705,500 including a 10% or $370,550 change order authority and approve the <br />capital expenditure for Work Order No. 2011305 in the amount of $5,058,000. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Reject as non-responsive the bids submitted by Norstar Plumbing and Engineering, Inc. of <br />Alta Loma, California and Mladen Buntich Construction Co., Inc. of Upland, California, in <br />the respective amounts of $2,988,000 and $3,275,122; <br />2. Award Bid No. RPU -7759 to C.P. Construction Co., Inc., of Ontario, California, in the <br />amount of $3,705,500 for the construction of the Magnolia Avenue Techite Pipe <br />Replacement Project (Harrison Street to Van Buren Boulevard); <br />3. Authorize change order authority for the C.P. Construction Co., Inc. Construction Contract <br />in the amount of 10% or $370,550 for Bid No. RPU -7759; and <br />4. Approve the capital expenditure for Work Order No. 2011305 in the amount of $5,058,000 <br />which includes all design, construction, construction support, contract administration, <br />inspection and construction change order authority costs for the Magnolia Avenue Techite <br />Pipe Replacement Project (Harrison Street to Van Buren Boulevard). <br />BACKGROUND: <br />Riverside Public Utilities (RPU) owns and operates water transmission pipelines, of which <br />approximately 4.4 miles are Techite pipe. This section of the Techite pipe has been determined <br />to have reached the end of its useful life based on age, service history and physical inspection <br />