Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2020 BPU
>
07-27-20
>
07-27-2020 BPU RPT 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 7:18:23 PM
Creation date
7/16/2020 9:54:31 AM
Metadata
Fields
Template:
General
Document Relationships
07-27-2020 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2020 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />• ' Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />DATE: JULY 27, 2020 <br />ITEM NO: 4 <br />SUBJECT: RFP NO. 1987 LICENSE AGREEMENT FOR SUBSTATION DESIGN SOFTWARE <br />WITH SPATIAL BUSINESS SYSTEMS INC. FOR A THREE-YEAR TERM IN THE <br />AMOUNT OF $153,900 <br />ISSUES: <br />Approve a License Agreement in response to RFP No. 1987 for Substation Design Software with <br />Spatial Business Systems Inc., of Lakewood, Colorado, in the amount of $153,900 for a three- <br />year term; and approve future ongoing annual license renewal, subject to the availability of <br />budgeted funds. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Approve a License Agreement in response to RFP No. 1987 for Substation Design <br />Software with Spatial Business Systems Inc., of Lakewood, Colorado, in the amount of <br />$153,900 for three-year term; <br />2. Authorize the City Manager, or designee, to execute the software license agreement, with <br />Spatial Business Systems Inc., for a three-year term, including making minor and non - <br />substantive changes; and <br />3. Approve future ongoing annual license renewal, subject to the availability of budgeted <br />funds. <br />BACKGROUND: <br />As technology advances and more extensive power system protective schemes and automation <br />schemes are integrated and employed at electrical substations, the design is becoming more <br />complex and time-consuming as it requires the development of hundreds of electrical drawings, <br />schematics, and wiring diagrams. <br />The current state of substation engineering design and construction document creation has been <br />a process that has made advances from pencil and paper to digital but has not included the <br />automation of routine design functions. At the beginning of the 1990s, Substation Engineering <br />standardized using Autodesk's AutoCAD software for substation physical design and substation <br />
The URL can be used to link to this page
Your browser does not support the video tag.