Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2020 BPU
>
07-13-20
>
07-13-2020 BPU RPT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 10:10:46 AM
Creation date
7/16/2020 9:44:07 AM
Metadata
Fields
Template:
General
Document Relationships
07-13-2020 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2020 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />• ' Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: JULY 13, 2020 <br />ITEM NO: 3 <br />SUBJECT: 12KV ELECTRICAL FEEDER EXTENSION FOR THE EXCHANGE <br />DEVELOPMENT PROJECT — WORK ORDER NO. 2016410 FOR A TOTAL <br />CAPITAL EXPENDITURE IN THE AMOUNT OF $166,000 <br />ISSUE: <br />Approve Work Order No. 2016410 for a total capital expenditure of $166,000 for the 12kV <br />Electrical Feeder Extension for The Exchange Development Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 2016410 in the amount of $166,000 for <br />the 12kV Electrical Feeder Extension for The Exchange Development Project. <br />BACKGROUND: <br />The Exchange Development project is breaking ground in July 2020 as a mixed-use development <br />on approximately 35 acres. The project is located near Orange Street and Strong Street and will <br />be constructed in two phases. Phase 1 is expected to be ready for occupancy June 2021, while <br />Phase 2 is expected to be ready for occupancy March 2022. Engineering staff closely coordinated <br />with the developer on the layout of electric distribution facilities to maximize land use and esthetics <br />at the project site. <br />Riverside Public Utilities (RPU) will extend an underground 12kV electrical line from Main Street <br />along Oakley Avenue to Orange Street to provide electric service to the project. For Phase 1 of <br />the project, the developer has requested that permanent electrical service be available no later <br />than March 2021. Electric distribution facilities will be available at the site for Phase 2 and will be <br />energized in late 2021. In collaboration with the developer, RPU engineering staff prepared <br />electrical plans and specifications for the 12kV underground electrical line extension to the project <br />site. A separate work order will be created for installation of onsite distribution facilities, including <br />transformers, junction cabinets, primary cable and secondary cable, and associated facilities. All <br />costs associated with the onsite electrical distribution facilities will be covered by the developer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.