W A T E R E N E R G Y I L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />PUBLIC UTILITIES <br />BOARD OF PUBLIC UTILITIES DATE: MARCH 9, 2020 <br />ITEM NO: 7 <br />SUBJECT: WORK ORDER NO. 1912417 IN THE TOTAL AMOUNT OF $323,000 FOR <br />CONSTRUCTION OF ROYAL PALM WATER MAIN REPLACEMENT PROJECT <br />ISSUE: <br />Approve Work Order No. 1912417 in the total amount of $323,000 for all design, construction, paving and <br />construction contingency costs for the Royal Palm Water Main Replacement Project. <br />RECOMMENDATION: <br />That the Board of Public Utilities approve Work Order No. 1912417 in the total amount of $323,000 for all <br />design, construction, paving and construction contingency costs for the Royal Palm Water Main <br />Replacement Project. <br />BACKGROUND: <br />The Royal Palm Water Main Replacement Project is part of Riverside Public Utilities' (RPU) ongoing water <br />main replacement program to replace old and high priority water mains. The project area consists of <br />existing 6 -inch and 8 -inch asbestos cement water mains that were installed in 1956 and 1964, respectively. <br />The 8 -inch segment of pipeline is located within an easement along the northeasterly edge of the Rancho <br />Riverside Mobile Home Park. Access to this segment of pipeline is very challenging due to its location <br />within the backyards of mobile home residents. In addition, the water meter for the mobile home park is <br />located behind a block wall in a resident's side yard, rendering it very difficult to access and maintain. <br />This project facilitates abandoning the segment of water pipeline within the easement and relocates the <br />existing water meter in the public right-of-way according to RPU's current standards. These pipelines have <br />been identified as high priority pipelines for replacement to enhance system reliability and improve fire flow <br />capacity. <br />This project is in line with RPU's infrastructure road map and Utility 2.0 and directly benefits RPU water <br />customers within the vicinity of the project in terms of system reliability and improved fire protection. <br />DISCUSSION: <br />The work generally entails the construction of approximately 455 linear feet of 8 -inch ductile iron pipe, 10 <br />linear feet of 6 -inch ductile iron pipe, 35 linear feet of 4 -inch ductile iron pipe, seven (7) water services, one <br />(1) fire hydrant and three (3) system connections, along with all necessary fittings, appurtenances and <br />related incidental work. The work also involves abandoning approximately 10,070 linear feet of 8 -inch, 6 - <br />inch and 4 -inch old water pipelines and related facilities. Once the pipelines are abandoned, the easement <br />