Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2020 BPU
>
03-09-20
>
03-09-2020 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 5:52:19 PM
Creation date
3/31/2020 7:39:12 AM
Metadata
Fields
Template:
General
Document Relationships
03-09-2020 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2020 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />• ' Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES <br />DATE: MARCH 9, 2020 <br />ITEM NO: 6 <br />SUBJECT: SUPPLEMENTAL AGREEMENT WITH CDM SMITH, INC. IN RESPONSE TO <br />REQUEST FOR PROPOSAL FOR RIVERSIDE PUBLIC UTILITIES PRAED BOOSTER <br />HYDRAULIC TRANSIENT AND STATION SURGE ISSUES IN AN AMOUNT NOT TO <br />EXCEED $82,370 PLUS A 10% OR $8,237 CHANGE ORDER AUTHORITY AND WORK <br />ORDER NO. 2016310 FOR A TOTAL EXPENDITURE OF $120,607 <br />ISSUES: <br />Approve a Supplemental Agreement with CDM Smith, Inc, of Carlsbad, California, in response to a <br />Request for Proposals for Riverside Public Utilities Praed Booster Hydraulic Transient and Station Surge <br />Issues in an amount not to exceed $82,370.00; authorize a 10% or $8,237 change order authority for the <br />project; and approve Work Order No. 2016310 for a total expenditure of $120,607. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />Approve a Supplemental Agreement with CDM Smith, Inc. in response to a Request for <br />Proposals for Riverside Public Utilities Praed Booster Hydraulic Transient and Station Surge <br />Issues, in an amount not to exceed $82,370.00; <br />2. Authorize change order authority in the amount of 10% or $8,237 for Riverside Public Utilities <br />Praed Booster Hydraulic Transient and Station Surge Issues; <br />3. Approve Work Order No. 2016310 for a total expenditure of in the amount of $120,607 which <br />includes CDM Smith, staff support and change order authority costs for Riverside Public Utilities <br />Praed Booster Hydraulic Transient and Station Surge Issues; and <br />4. Authorize the City Manager, or designee, to execute the Supplemental Agreement with CDM <br />Smith, Inc. of Carlsbad, California, including making minor and non -substantive changes and to <br />sign all documents and instruments necessary to complete the transactions. <br />BACKGROUND: <br />The Praed pressure zone is a small closed zone that operates without the support of a water supply <br />reservoir and is solely supplied with water from the Praed Booster Station. The Praed Booster Station <br />was built in 1987 and has since experienced additional development over time. In late 2015, customers <br />in a newly developed housing tract began to experience inconsistent pressure issues and at times had low <br />pressure. Staff investigated and was able to rectify most of the issues; however, minor pressure issues <br />
The URL can be used to link to this page
Your browser does not support the video tag.