Laserfiche WebLink
W A T E R E N E R G Y L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: NOVEMBER 25, 2019 <br />ITEM NO: 17 <br />SUBJECT: BID NO. RPU -7711 FOR DRILLED PIER FOUNDATIONS WITH ASPLUNDH CONSTRUCTION <br />LLC., IN THE AMOUNT OF $3,584,000; BID NO. RPU -7721 FOR POTHOLING WITH HOT LINE <br />CONSTRUCTION INC. IN THE AMOUNT OF $52,650; AND WORK ORDER NO. 2006768 FOR <br />A TOTAL CAPITAL EXPENDITURE OF $4,109,600 <br />ISSUES: <br />Award Bid No. RPU -7711 for Drilled Pier Foundations to Asplundh Construction, LLC., of Anaheim, California, in <br />the amount of $3,584,000; award Bid No. RPU -7721 for Potholing to support Drilled Pier Foundations installation <br />at nine (9) locations to Hot Line Construction, INC., of Brentwood, California, in the amount of $52,650; and <br />approve Work Order No. 2006768 for the total capital expenditure of $4,109,600 for the purpose of tracking work <br />specifically related to the Drilled Pier Foundations as part of the RTRP Work Order 642975 and within the Work <br />Order amount of $71,605,521, following Board approval of the RTRP Work Order increase on November 25, 2019. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award Bid No. RPU -7711 for Drilled Pier Foundations to Asplundh Construction, LLC., of Anaheim, <br />California, in the amount of $3,584,000; <br />2. Award Bid No. RPU -7721 for Potholing to support Drilled Pier Foundations installation at nine (9) <br />locations to Hot Line Construction, INC., of Brentwood, California, in the amount of $52,650; and <br />3. Approve Work Order No. 2006768 for the total capital expenditure of $4,109,600 for the purpose of <br />tracking work specifically related to the Drilled Pier Foundations as part of the RTRP Work Order <br />642975 and within the amount of $71,605,521, following Board approval of the RTRP Work Order <br />increase on November 25, 2019. <br />BACKGROUND: <br />The Riverside Transmission Reliability Project (RTRP) is a joint project with Southern California Edison (SCE) <br />to provide Riverside a second connection to the state electric transmission grid to address the capacity and <br />reliability needs of the City. In addition, the project includes improvements to RPU's transmission system <br />within the City to increase capacity between key substations. This bid award relates to the City's internal <br />transmission system upgrades, which are necessary regardless of the timing and outcome of the larger RTRP <br />project for the second connection to the state electric transmission grid. <br />On January 20, 2006, the Board of Public Utilities (Board) approved the RTRP and Work Order No. 642975. <br />On February 5, 2013, the City Council certified the Final Environmental Impact Report (FEIR) for the entire <br />project. On October 17, 2014, the Board authorized total funds for the RTRP Work Order 642975 in the <br />