Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2019 BPU
>
09-23-19
>
09-23-2019 BPU RPT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2019 12:36:25 PM
Creation date
9/26/2019 2:49:25 PM
Metadata
Fields
Template:
General
Document Relationships
09-23-2019 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2019 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
PJ A r F R F N F R c v L I F E <br />RIVERSIDE PUBLIC UTILITIES <br />W& Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: SEPTEMBER 23, 2019 <br />ITEM NO: 6 <br />SUBJECT: BID NO. RPU -7637 FOR CONDUIT AND STRUCTURE INSTALLATION FOR CABLE <br />REPLACEMENT PROJECT LOCATED NEAR MERLIN DRIVE AND PERCIVAL DRIVE <br />FROM HOT LINE CONSTRUCTION IN THE AMOUNT OF $556,607.25; AND WORK <br />ORDER NO. 1833153 FOR A TOTAL CAPITAL EXPENDITURE OF $740,000 <br />ISSUES: <br />Award Bid No. RPU -7637 for the conduit and structure installation for the cable replacement project located <br />near Merlin Drive and Percival Drive, to Hot Line Construction, Inc., of Brentwood, California, in the amount <br />of $556,607.25 and approve Work Order No. 1833153 for a total capital expenditure of $740,000 work <br />related to the project. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1. Award Bid No. RPU -7637 for the conduit and structure installation for the cable replacement project <br />located near Merlin Drive and Percival Drive, to Hot Line Construction, Inc., of Brentwood, <br />California, in the amount of $556,607.25; and <br />2. Approve Work Order No. 1833153 for a total capital expenditure of $740,000 for work related to <br />the project. <br />BACKGROUND: <br />Due to a primary cable burn-up on Merlin Drive and Lancelot Court, contract crews and Public Utilities <br />(RPU) electric field crews replaced a portion of aged High Molecular Weight Polyethylene (HMPE) cable <br />at the proposed project location. Existing primary cable -in -conduit feeding multiple underground structures <br />serving the neighborhood near Merlin Drive and Percival Drive must be replaced with new conduit and <br />cable. <br />As part of RPU's cable replacement program, the remaining sections of deteriorated cable and related <br />underground distribution facilities will be proactively replaced to enhance electric system reliability and <br />safety, improve power quality and service to customers, and improve system operation and outage <br />response in the neighborhood. Replacement of aged underground infrastructure is identified as part of the <br />Utility 2.0 Electric Infrastructure Road Map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.