Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2019 BPU
>
09-09-19
>
09-09-2019 BPU RPT 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 9:04:15 AM
Creation date
9/4/2019 10:42:38 AM
Metadata
Fields
Template:
General
Document Relationships
09-09-2019 BPU AGENDA
(Cover Page)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2019 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
rY A i F R f N= k C, Y T I F F <br />RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />P U B L I C U T I L I T I E S <br />BOARD OF PUBLIC UTILITIES DATE: SEPTEMBER 9, 2019 <br />ITEM NO: 7 <br />SUBJECT: AMERICAN PUBLIC POWER ASSOCIATION RELIABLE PUBLIC POWER PROVIDER <br />PROGRAM APPLICATION <br />ISSUE: <br />Receive this report for the American Public Power Association's Reliable Public Power Provider program <br />application overview. <br />RECOMMENDATION: <br />That the Board of Public Utilities receive this report for Riverside Public Utilities application overview for <br />the American Public Power Association's Reliable Public Power Provider program. <br />BACKGROUND: <br />American Public Power Association (APPA) is the voice for 2,000 state and local public power utilities <br />nationwide, in which they provide advice on electricity policy, technology, trends, training, and operations. <br />Reliable Public Power Provider (RP3) is an APPA program that recognizes electric utilities that <br />demonstrate a high level of proficiency through an online application that evaluates their practices and <br />accomplishments in four (4) categories. The four (4) categories are Safety, Reliability, Workforce <br />Development, and System Improvement. Riverside Public Utilities (RPU) has participated in the RP3 <br />program for the last 12 years — and has been recognized with three (3) Platinum awards and most recently, <br />two (2) Diamond awards. <br />RELIABLE <br />w �•►�_ <br />.. PVB�Ir <br />r3 <br />P�Aw <br />_ _. CA - <br />PROVIDER <br />Reliable Public <br />Power Provider <br />• <br />CnY OF RIVERSIDE <br />PUBLIC UTILITIES <br />RIVERSIDE PUBLIC U.TILITIES <br />RIVERSIDE, CA <br />RIVERSIDE, / <br />DIAMOND MEMBER <br />Diammd Member <br />3017 - 2020 <br />2014-2017 <br />AWA � <br />F-06- IQ <br />POWER. <br />2014 and <br />2017 Diamond Members <br />
The URL can be used to link to this page
Your browser does not support the video tag.