Home
Clerk
>
Board and Commissions Administration
>
Boards and Commissions-Agendas-Reports-Minutes
>
Board of Public Utilities
>
Reports
>
2018 BPU
>
01-08-18
>
01-08-2018 BPU RPT 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2019 12:26:14 PM
Creation date
8/5/2019 4:24:52 PM
Metadata
Fields
Template:
General
Document Relationships
01-08-2018 BPU AGENDA
(Superseded by)
Path:
\Board and Commissions Administration\Boards and Commissions-Agendas-Reports-Minutes\Board of Public Utilities\Agendas\2018 BPU
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIESDATEJANUARY 8, 2018 <br />GENERAL MANAGERS REPORT <br />ITEM NO:17 <br />SUBJECT: MONTHLY POWER SUPPLY REPORT – November, 2017 <br />Power Usage: <br />Wholesale Load (Vista): – 166,220 MWH (Chart1) <br />Peak Demand: – 319MWof which289MW came from RVSD available resources (Chart2) <br />RVSD Energy Mix (Chart1): <br />ResourceMWH <br />a)Nuclear8,574 <br />b)Coal59,873 <br />c)Large Hydroelectric2,282 <br />d)Natural Gas10,308 <br />e)Renewables68,687 <br />f)Inter SC Trades- <br />g)Green Inter SC Trades- <br />h)CAISO Purchases16,496 <br />Total:166,220 <br />Total Green Power Supply – 68,687MWHwhich yields 41.32% of the Total Wholesale Load Requirement <br />Resource Availability: <br />Nuclear: Palo Verde units 1, 2 and 3 operated at 91.60% capacity factor for the month. <br />Coal: IPP units 1 and 2 operated at 60.70% capacity factor for the month. <br />Large Hydro: Hoover, RVSD’s capacity entitlement was 20 MW, with energy entitlement of 2,282 MWH. <br />Natural Gas:Clearwater’s availability was 100.00% for the month. <br /> RERC’s (Units 1, 2, 3 and 4)availability was 49.99% for the month. <br /> Springs’s (Units 1, 2, 3 and 4)availability was 100.00% for the month. <br />Renewable: Salton Sea units operated at 100.00% capacity factor for the month. <br />Vulcan unit operated at 91.32% capacity factor for the month. <br />Wintec operated at 23.94%capacityfactor. <br />WKN operated at 23.63% capacityfactor. <br />Transwind operated at 18.34% capacity factor. <br />Kingbird Solar operated at 22.59% capacity factor. <br />Tequesquite Solar operated at 14.79% capacity factor. <br />AP North Lake Solar operated at 15.89% capacity factor. <br />Camelot Solar2 operated at 23.05% capacity factor. <br />Bigsky Solar3 operated at 22.46% capacity factor. <br />Bigsky Solar7 operated at 19.90% capacity factor. <br />Bigsky Solar1X operated at 22.51% capacity factor. <br /> <br />The attached graphical comparisons represents RPU’s November: <br />Chart 1: Total Energy Requirements/Resource Mix <br />Chart2: Peak Hour TotalCapacity <br />Chart3: Retail Customer Load <br />Chart4: Daily Peak Load and TemperatureComparisons <br />Chart 5:MonthlyPeak Load and Temperature <br />Page 305 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.