Laserfiche WebLink
RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIESDATE: JANUARY 8, 2018 <br />ITEM NO:8 <br />SUBJECT: CONSTRUCTION OF THE EXPLORATORYUTILITY POTHOLE WORK FORTHE <br />MAGNOLIA AVENUE TECHITE PIPE REPLACEMENT PROJECT – AWARD OF BID <br />NO. RPU-7528TO T.E. ROBERTS, INC. OF ORANGE, CALIFORNIA,IN THE AMOUNT <br />OF $153,151– APPROVE WORK ORDER NO. 1612632FOR $484,000 <br />ISSUES: <br />Award Bid No. RPU-7528toT.E. Roberts, Inc. of Orange,California, for the construction of the <br />ExploratoryUtilityPothole Work fortheMagnolia Avenue Techite Pipe Replacement Projectin the <br />amount of $153,151, and approve the expenditure of $484,000for Work Order No. 1612632 that <br />includes abudgetary amount to cover upfront costs for the pipelinedesignby Riverside Public Utilities <br />staff. <br />RECOMMENDATIONS: <br />That the Board of Public Utilities: <br />1.Award a contract for the construction of the Exploratory Utility Pothole Work fortheMagnolia <br />Avenue Techite Pipe Replacement Project – Bid No. RPU-7528to the lowest responsive and <br />responsible bidder, T.E. Roberts, Inc.of Orange,California, in the amount of $153,151; and <br />2.Approve the capital expenditure of $484,000for Work Order No. 1612632, which includesall <br />design, construction, paving, contract administration, inspection and construction contingency <br />costs for the Exploratory Utility Pothole Work for the Magnolia Avenue Techite Pipe Replacement <br />Project. A budgetary amount is also included to cover upfront costs for the pipelinedesignby <br />RPU staff. <br />BACKGROUND: <br />The Public Works Department (PW) is scheduled to construct a street improvement project along <br />Magnolia Avenue between Buchanan Street and Tyler Street. The project will entail modifications to the <br />center medians to accommodate a third traffic lane in each direction and installation of new curb, gutter, <br />sidewalk and asphalt pavement at various places along with modifications to the traffic signals and <br />existing storm drain facilities. <br />In advance of and in coordination with the street improvement project, Riverside Public Utilities (RPU) <br />will replace approximately 5,500linear feet of 27-inch and 36-inchTechite pipeline currently in use along <br />Magnolia Avenue between Park Sierra Drive and Hole Avenue with cement mortar lined and coated steel <br />pipe. RPU will also replace approximately 2,000 linear feet of old 6-inch diameter cast Iron pipe with 12- <br />inch ductile iron pipe. In addition, the existing Polk and Magnolia pressure reducing stations will be <br />replaced with a single pressure reducing station facility. <br />Page 40 <br /> <br />