Laserfiche WebLink
RIVERSIDE PUBLIC UTILITIES <br />Board Memorandum <br />BOARD OF PUBLIC UTILITIESDATE: MARCH 12, 2018 <br />ITEM NO:12 <br />SUBJECT:WATER HIGHLIGHTS – January 2018 <br />Domestic water production for the month ofJanuary2018totaled 3,867 acre-feet(1,260million gallons), <br />with the following resource mix: <br />Bunker Hill Basin: 68% <br />Riverside Basin: 32% <br />Purchased Water: 0% <br />Peak waterusage for the month of January 2018,was50million gallons per day (mgd) and occurred on <br />January 4th. <br />Under theCooperative Agreement for Water Production and Conveyance with Western Municipal Water <br />District, 764AF of potable water and 4 AF of irrigationwater weredelivered toWMWD. <br />There were no significant events for the water system in January 2018. <br />January2018December2017January2017 <br />Peak Consumption:50mgd55mgd36mgd <br />Average Consumption:41mgd48mgd29mgd <br />Minimum Consumption:29mgd43mgd25mgd <br />Total Consumption:3,867AF4,597AF2,763AF <br />Peak Temperature:869082 <br />Average Temperature:767663 <br />Minimum Temperature:615653 <br />DecemberGallons Per-CapitaPer Day (GPCD): 143gallons <br />(-4% reductionfrom 2013bench mark) <br />DecemberResidential GallonsPer-Capita Per Day (R-GPCD): 86gallons <br />Page 89 <br />